{"id":274777,"date":"2025-07-06T15:00:43","date_gmt":"2025-07-06T19:00:43","guid":{"rendered":"https:\/\/inspenet.com\/?p=274777"},"modified":"2025-07-04T15:19:17","modified_gmt":"2025-07-04T19:19:17","slug":"sre-entrusts-cwp-with-offshore-foundations-for-formosa-4-wind-farm","status":"publish","type":"noticias","link":"https:\/\/inspenet.com\/en\/news\/sre-entrusts-cwp-with-offshore-foundations-for-formosa-4-wind-farm\/","title":{"rendered":"SRE entrusts CWP with offshore foundations for Formosa 4 wind farm"},"content":{"rendered":"\n<p>Synera Renewable Energy Group (SRE) has selected Century Wind Power (CWP) as the primary <strong>foundation<\/strong> supplier <strong>for its Formosa 4 offshore wind farm<\/strong>, located off the coast of Miaoli County.<\/p>\n\n<p>The contract includes the supply of 35 <strong><a href=\"https:\/\/inspenet.com\/en\/news\/seatools-wins-contract-for-hydraulic-system-for-fengmiao-1-wind-farm\/\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/inspenet.com\/noticias\/seatools-contrato-parque-eolico-fengmiao-1\/\" rel=\"noreferrer noopener\">jacket foundations for wind turbines<\/a><\/strong> for wind turbines, as well as the integral management of the foundation package. This choice also demonstrates SRE&#8217;s commitment to strengthening its network of local and international suppliers. <\/p>\n\n<h2 class=\"wp-block-heading\">Local coordination and regional integration<\/h2>\n\n<p><strong>Century Wind Power will lead the technical and logistical coordination<\/strong>, integrating <strong><a href=\"https:\/\/inspenet.com\/en\/articulo\/additive-manufacturing-technologies\/\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/inspenet.com\/articulo\/analisis-tecnologias-de-manufactura-aditiva\/\" rel=\"noreferrer noopener\">Taiwanese manufacturing capabilities<\/a><\/strong> Taiwanese manufacturing capabilities with international resources from the Asia-Pacific region. The main objective is to meet the established deadlines for grid connection and ensure the quality of the structures, in line with industry standards. <\/p>\n\n<p>Lucas Lin, president of SRE, emphasized that this collaboration with a domestic supplier represents much more than regulatory compliance.  <\/p>\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p>It reinforces our sustainable development model for wind farms and anticipates the growth of the marine ecosystem in Phase 3 of the zonal development.<\/p>\n<cite>He stated.<\/cite><\/blockquote>\n\n<h2 class=\"wp-block-heading\"><strong>Formosa 4 leads the progress in Phase 3 of wind power development<\/strong><\/h2>\n\n<p>The Project <strong><a href=\"https:\/\/www.sreglobal.com\/news\/2025\/07\/%E9%A2%A8%E7%9D%BF%E8%83%BD%E6%BA%90%E5%A7%94%E8%A8%97%E4%B8%96%E7%B4%80%E9%A2%A8%E9%9B%BB%E6%89%93%E9%80%A0%E9%AB%98%E5%93%81%E8%B3%AA%E6%B0%B4%E4%B8%8B%E5%9F%BA%E7%A4%8E\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/www.sreglobal.com\/news\/2025\/07\/%E9%A2%A8%E7%9D%BF%E8%83%BD%E6%BA%90%E5%A7%94%E8%A8%97%E4%B8%96%E7%B4%80%E9%A2%A8%E9%9B%BB%E6%89%93%E9%80%A0%E9%AB%98%E5%93%81%E8%B3%AA%E6%B0%B4%E4%B8%8B%E5%9F%BA%E7%A4%8E\" rel=\"noreferrer noopener\">Formosa 4<\/a><\/strong> was awarded 495 MW of capacity in the first round of Phase 3 auctions, held in 2022, and was the first to receive a permit to establish by the end of 2024. SRE plans to start <strong><a href=\"https:\/\/inspenet.com\/en\/articulo\/types-of-construction-technologies-trends\/\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/inspenet.com\/articulo\/tipos-de-construccion-tecnologias-tendencias\/\" rel=\"noreferrer noopener\">construction activities<\/a><\/strong> within the regulatory schedule, making Formosa 4 a benchmark for future developments. <\/p>\n\n<p>For his part, CWP President Wen-Hsiang Lai stressed that the contract consolidates the company&#8217;s years of investment and validates its ability to lead the fabrication and assembly of critical structures at its local facilities.<\/p>\n\n<p>The partnership between SRE and CWP is part of a regional trend that prioritizes strengthening the domestic supply chain as a long-term strategy. As Taiwan moves forward with its commitments to energy <strong><a href=\"https:\/\/inspenet.com\/en\/articulo\/effect-logistics-in-the-energy-transition\/\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/inspenet.com\/articulo\/efecto-logistica-en-la-transicion-energetica\/\" rel=\"noreferrer noopener\">energy transition<\/a><\/strong>As Taiwan moves forward with its energy transition commitments, projects such as Formosa 4 set a technical and political tone for the development of the offshore wind sector in the Asia-Pacific. <\/p>\n\n<p><strong>Follow us on social networks and don&#8217;t miss any of our publications!<\/strong><\/p>\n\n<p><a href=\"https:\/\/www.youtube.com\/@inspenet\" rel=\"nofollow noopener\" target=\"_blank\">YouTube<\/a> <a href=\"https:\/\/www.linkedin.com\/company\/inspenetnetwork\" rel=\"nofollow noopener\" target=\"_blank\">LinkedIn<\/a> <a href=\"https:\/\/www.facebook.com\/inspenetnetwork\" rel=\"nofollow noopener\" target=\"_blank\">Facebook<\/a> <a href=\"https:\/\/www.instagram.com\/inspenet\/\" rel=\"nofollow noopener\" target=\"_blank\">Instagram<\/a> <a href=\"https:\/\/x.com\/Inspenetnetwork\" rel=\"nofollow\">X (Twitter)<\/a> <a href=\"https:\/\/www.tiktok.com\/@inspenet?_t=8qqIL6dRGNR&amp;_r=1\" rel=\"nofollow noopener\" target=\"_blank\">TikTok<\/a><\/p>\n\n<p><strong>Source: <a href=\"https:\/\/www.sreglobal.com\/news\/2025\/07\/%E9%A2%A8%E7%9D%BF%E8%83%BD%E6%BA%90%E5%A7%94%E8%A8%97%E4%B8%96%E7%B4%80%E9%A2%A8%E9%9B%BB%E6%89%93%E9%80%A0%E9%AB%98%E5%93%81%E8%B3%AA%E6%B0%B4%E4%B8%8B%E5%9F%BA%E7%A4%8E\" data-type=\"link\" data-id=\"https:\/\/www.sreglobal.com\/news\/2025\/07\/%E9%A2%A8%E7%9D%BF%E8%83%BD%E6%BA%90%E5%A7%94%E8%A8%97%E4%B8%96%E7%B4%80%E9%A2%A8%E9%9B%BB%E6%89%93%E9%80%A0%E9%AB%98%E5%93%81%E8%B3%AA%E6%B0%B4%E4%B8%8B%E5%9F%BA%E7%A4%8E\" rel=\"nofollow noopener\" target=\"_blank\">Synera Renewable Energy<\/a><\/strong><\/p>\n\n<p><strong>Photo: Shutterstock<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Formosa 4 was the first Phase 3 project to receive a permit to establish in Taiwan.<\/p>\n","protected":false},"author":9014,"featured_media":274262,"menu_order":0,"comment_status":"open","ping_status":"closed","template":"","meta":{"_acf_changed":false,"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":""},"categoria_noticias":[13026,13044],"etiqueta_noticias":[],"class_list":["post-274777","noticias","type-noticias","status-publish","has-post-thumbnail","hentry","categoria_noticias-energy","categoria_noticias-new-energies"],"acf":[],"_links":{"self":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/274777","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias"}],"about":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/types\/noticias"}],"author":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/users\/9014"}],"replies":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/comments?post=274777"}],"version-history":[{"count":0,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/274777\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media\/274262"}],"wp:attachment":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media?parent=274777"}],"wp:term":[{"taxonomy":"categoria_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/categoria_noticias?post=274777"},{"taxonomy":"etiqueta_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/etiqueta_noticias?post=274777"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}