{"id":268518,"date":"2025-06-18T10:04:26","date_gmt":"2025-06-18T14:04:26","guid":{"rendered":"https:\/\/inspenet.com\/noticias\/petrobras-resumes-construction-work-on-rnest-train-2\/"},"modified":"2025-06-18T11:15:43","modified_gmt":"2025-06-18T15:15:43","slug":"petrobras-resumes-construction-work-on-rnest-train-2","status":"publish","type":"noticias","link":"https:\/\/inspenet.com\/en\/news\/petrobras-resumes-construction-work-on-rnest-train-2\/","title":{"rendered":"Petrobras resumes construction work on RNEST Train 2"},"content":{"rendered":"\n<p><strong>Petrobras <\/strong>has made official the signing of new contracts that will give continuity to the construction of the second processing train at the <strong>Abreu e Lima Refinery<\/strong><em>(RNEST<\/em>), located in the state of Pernambuco.<\/p>\n\n<h2 class=\"wp-block-heading\">RNEST Train 2 construction for new industrial plants<\/h2>\n\n<p>This agreement contemplates the implementation of three essential units to expand the refinery&#8217;s operating capacity: a <strong>delayed coking plant <\/strong><em>(UCR<\/em>), a <strong>hydrotreating unit for low-sulfur diesel<\/strong><em>(UHDT-D<\/em>) and an <strong>atmospheric distillation plant<\/strong><em>(UDA<\/em>), which will increase the production of high-value derivatives, essential for supplying the domestic market with cleaner fuels.<\/p>\n\n<p>According to figures presented by <strong><a href=\"https:\/\/inspenet.com\/en\/news\/petrobras-first-carbon-neutral-gasoline\/\" data-type=\"post\" data-id=\"100108\" target=\"_blank\" rel=\"noreferrer noopener\">Petrobras<\/a><\/strong>According to figures presented by Petrobras, the <strong>UCR <\/strong>will have a processing capacity of up to 75,000 barrels per day, the <strong>UHDT-D <\/strong>will operate with 82,000 barrels per day, and the <strong>UDA <\/strong>will reach 130,000 barrels per day. These figures strengthen RNEST as one of the most relevant industrial centers for the Brazilian oil industry. <\/p>\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p>RNEST is strategic for Brazil, as it is Petrobras&#8217; operations center in the North and Northeast regions.<\/p>\n\n\n\n<p>The contracts to resume construction of Train 2 of the refinery demonstrate the company&#8217;s commitment to the country&#8217;s development.<\/p>\n\n\n\n<p>Representing the expansion of our refining capacity and allowing us to increase the production of derivatives to meet the demands of society and the market.<\/p>\n<cite>Magda Chambriard, Petrobras CEO.<\/cite><\/blockquote>\n\n<p>The selected contractor, <strong>Consag Engenharia SA<\/strong>, will be responsible for executing the works, which include the installation of new industrial technologies and increasing the level of automation of the oil complex.<\/p>\n\n<p>Since its start-up in 2014, <strong>RNEST <\/strong>has been recognized as the most advanced refinery in Petrobras&#8217; fleet. With the completion of the second train, the plant&#8217;s installed capacity will double, reaching 260,000 barrels per day and establishing itself as the company&#8217;s second largest refinery. <\/p>\n\n<p>Recent plant events include the start-up of the <strong>SNOX unit <\/strong>in December 2024, dedicated to the <strong>reduction of pollutant emissions<\/strong> and the <strong>production of sulfuric acid<\/strong> as a marketable by-product.  <\/p>\n\n<p id=\"block-7452d964-8e0e-434c-8722-e283cd8a8d98\"><strong>Follow us on social networks and don&#8217;t miss any of our publications!<\/strong><\/p>\n\n<p id=\"block-e2855ed1-40c2-45d5-8f10-42fa8b26dae2\"><a href=\"https:\/\/www.youtube.com\/@inspenet\" rel=\"nofollow noopener\" target=\"_blank\">YouTube<\/a> <a href=\"https:\/\/www.linkedin.com\/company\/inspenetnetwork\" rel=\"nofollow noopener\" target=\"_blank\">LinkedIn<\/a> <a href=\"https:\/\/www.facebook.com\/inspenetnetwork\" rel=\"nofollow noopener\" target=\"_blank\">Facebook<\/a> <a href=\"https:\/\/www.instagram.com\/inspenet\/\" rel=\"nofollow noopener\" target=\"_blank\">Instagram<\/a> <a href=\"https:\/\/x.com\/Inspenetnetwork\" rel=\"nofollow\">X (Twitter)<\/a> <a href=\"https:\/\/www.tiktok.com\/@inspenet?_t=8qqIL6dRGNR&amp;_r=1\" rel=\"nofollow noopener\" target=\"_blank\">TikTok<\/a><\/p>\n\n<p id=\"block-a90af035-7ee7-4f00-80b9-6c97f3d833b3\"><strong>Source and photo: <a href=\"https:\/\/agencia.petrobras.com.br\/w\/petrobras-assina-contratos-para-a-retomada-da-construcao-do-trem-2-da-rnest\" target=\"_blank\" rel=\"noreferrer noopener\">Petrobras<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>This project will involve an investment of close to R$ 4.9 billion and is aligned with the strategic guidelines established in the company&#8217;s 2025-2029 Business Plan.<\/p>\n","protected":false},"author":8404,"featured_media":268405,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"_acf_changed":false,"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":""},"categoria_noticias":[13026,13036],"etiqueta_noticias":[],"class_list":["post-268518","noticias","type-noticias","status-publish","has-post-thumbnail","hentry","categoria_noticias-energy","categoria_noticias-oil-and-gas"],"acf":[],"_links":{"self":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/268518","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias"}],"about":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/types\/noticias"}],"author":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/users\/8404"}],"replies":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/comments?post=268518"}],"version-history":[{"count":0,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/268518\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media\/268405"}],"wp:attachment":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media?parent=268518"}],"wp:term":[{"taxonomy":"categoria_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/categoria_noticias?post=268518"},{"taxonomy":"etiqueta_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/etiqueta_noticias?post=268518"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}