{"id":254294,"date":"2025-05-08T09:59:56","date_gmt":"2025-05-08T13:59:56","guid":{"rendered":"https:\/\/inspenet.com\/noticias\/bw-energy-launches-maromba-field-development-with-low-risk-strategy-in-brazil\/"},"modified":"2025-05-08T11:45:18","modified_gmt":"2025-05-08T15:45:18","slug":"bw-energy-launches-maromba-field-development-with-low-risk-strategy-in-brazil","status":"publish","type":"noticias","link":"https:\/\/inspenet.com\/en\/news\/bw-energy-launches-maromba-field-development-with-low-risk-strategy-in-brazil\/","title":{"rendered":"BW Energy launches Maromba field development with low-risk strategy in Brazil"},"content":{"rendered":"\n<p>BW Energy <strong>has confirmed the final investment decision (FID) for the development of the Maromba field<\/strong>, located in the Campos Basin, 100 km offshore Brazil. The strategy contemplates a total investment of US$1.5 billion, and is based on the reuse of existing infrastructure, replicating the approach previously applied in Gabon. <\/p>\n\n<h2 class=\"wp-block-heading\">Modular and cost-effective production in the Maromba field<\/h2>\n\n<p>The project includes a reconditioned FPSO unit &#8211; the BW Maromba &#8211; and a self-elevating <strong><a href=\"https:\/\/inspenet.com\/en\/news\/mega-jack-5200-reduced-work-on-platform\/\" target=\"_blank\" data-type=\"post\" data-id=\"200452\" rel=\"noreferrer noopener\">self-elevating platform<\/a><\/strong> wellhead and drilling platform (WHP). This combination will allow for modular development, with six initial wells targeting the Maastricht sands, and a second campaign planned to expand the reservoir&#8217;s potential. <\/p>\n\n<p>First production is scheduled for the end of 2027, with a target of 60,000 barrels of oil per day. BW Energy anticipates that this figure will double its current net production by 2028. In addition, it estimates a production cost of less than $10 per barrel for the first five years.  <\/p>\n\n<p>The platform will drill up to 16 wells, and the infrastructure is expected to facilitate future expansion phases at low additional cost. Maromba heavy crude <strong>will trade at a discount to Brent<\/strong>, but the projected breakeven is competitive even in low price scenarios. <\/p>\n\n<h2 class=\"wp-block-heading\">Maromba moves forward with renewed FPSO<\/h2>\n\n<p>Currently, FPSO refurbishment work is being carried out at the COSCO <strong><a href=\"https:\/\/inspenet.com\/en\/news\/china-three-ecological-pulp-vessels\/\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/inspenet.com\/noticias\/naviera-china-buques-de-pulpa-ecologicos\/\" rel=\"noreferrer noopener\">COSCO shipyard<\/a><\/strong>shipyard in China. This vessel will have <strong>a storage capacity of one million barrels<\/strong> and will be able to process up to 100,000 barrels of liquids per day. <\/p>\n\n<p>The financing will combine operating cash flow, available lines of credit and support from major shareholder BW Group, which has already <strong>committed a US$250 million loan<\/strong>. <strong><a href=\"https:\/\/inspenet.com\/en\/news\/bw-energy-secures-production-extension-at-the-golfinho-field-until-2042\/\" target=\"_blank\" data-type=\"post\" data-id=\"244756\" rel=\"noreferrer noopener\">BW Energy<\/a><\/strong> is also exploring alternatives such as structured financing and bond issues.<\/p>\n\n<p>The <strong><a href=\"https:\/\/www.bwenergy.no\/assets\/brazil\/\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/www.bwenergy.no\/assets\/brazil\/\" rel=\"noreferrer noopener\">Maromba field<\/a><\/strong> field has 123 million barrels of proved reserves (2P) and additional contingent resources. The company expects this phase to validate additional reservoir horizons and open up new offshore development opportunities in Brazil. <\/p>\n\n<p><strong>Follow us on social media and don&#8217;t miss any of our posts!<\/strong><\/p>\n\n<p><a href=\"https:\/\/www.youtube.com\/@inspenet\" rel=\"nofollow noopener\" target=\"_blank\">YouTube<\/a> <a href=\"https:\/\/www.linkedin.com\/company\/inspenetnetwork\" rel=\"nofollow noopener\" target=\"_blank\">LinkedIn<\/a> <a href=\"https:\/\/www.facebook.com\/inspenetnetwork\" rel=\"nofollow noopener\" target=\"_blank\">Facebook<\/a> <a href=\"https:\/\/www.instagram.com\/inspenet\/\" rel=\"nofollow noopener\" target=\"_blank\">Instagram<\/a> <a href=\"https:\/\/x.com\/Inspenetnetwork\" rel=\"nofollow\">X (Twitter)<\/a> <a href=\"https:\/\/www.tiktok.com\/@inspenet?_t=8qqIL6dRGNR&amp;_r=1\" rel=\"nofollow noopener\" target=\"_blank\">TikTok<\/a><\/p>\n\n<p><strong>Source: <a href=\"https:\/\/www.bwenergy.no\/press-releases\/2025\/makes-fid-on-maromba-field-development-in-brazil\/\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/www.bwenergy.no\/press-releases\/2025\/makes-fid-on-maromba-field-development-in-brazil\/\" rel=\"noreferrer noopener\">BW Energy<\/a><\/strong><\/p>\n\n<p><strong>Photo: Shutterstock<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Production will begin in 2027 with six wells and a workover FPSO anchored in the Campos Basin.<\/p>\n","protected":false},"author":9014,"featured_media":254227,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"_acf_changed":false,"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":""},"categoria_noticias":[13026,13036],"etiqueta_noticias":[],"class_list":["post-254294","noticias","type-noticias","status-publish","has-post-thumbnail","hentry","categoria_noticias-energy","categoria_noticias-oil-and-gas"],"acf":[],"_links":{"self":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/254294","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias"}],"about":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/types\/noticias"}],"author":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/users\/9014"}],"replies":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/comments?post=254294"}],"version-history":[{"count":0,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/254294\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media\/254227"}],"wp:attachment":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media?parent=254294"}],"wp:term":[{"taxonomy":"categoria_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/categoria_noticias?post=254294"},{"taxonomy":"etiqueta_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/etiqueta_noticias?post=254294"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}