{"id":241476,"date":"2025-03-26T15:41:44","date_gmt":"2025-03-26T19:41:44","guid":{"rendered":"https:\/\/inspenet.com\/noticias\/baltic-powers-offshore-wind-farm-receives-first-certificates-of-conformity\/"},"modified":"2025-03-26T16:03:34","modified_gmt":"2025-03-26T20:03:34","slug":"baltic-powers-offshore-wind-farm-receives-first-certificates-of-conformity","status":"publish","type":"noticias","link":"https:\/\/inspenet.com\/en\/news\/baltic-powers-offshore-wind-farm-receives-first-certificates-of-conformity\/","title":{"rendered":"Baltic Power&#8217;s offshore wind farm receives first certificates of conformity"},"content":{"rendered":"\n<p><strong><a href=\"https:\/\/inspenet.com\/en\/news\/poland-wind-energy-loans-plan\/\" target=\"_blank\" rel=\"noreferrer noopener\">Poland&#8217;s offshore wind energy<\/a><\/strong> industry has just received a significant boost with the <strong>Baltic Power<\/strong> offshore wind farm. This project, based on a collaboration between <strong>ORLEN<\/strong> and <strong>Northland Power<\/strong> , has achieved the first <strong>design conformity certificates<\/strong> for its offshore turbines and substations. <\/p>\n\n<h2 class=\"wp-block-heading\">The design and construction of the Polish offshore wind farm<\/h2>\n\n<p>Obtaining the certificates paves the way for the wind farm&#8217;s <strong>construction phase<\/strong> . According to the <strong>Maritime Safety Law<\/strong> and the <strong>Law for the Promotion of Electricity Generation from Offshore Wind Farms<\/strong> , these certificates must be submitted before construction work begins, ensuring compliance with international safety and operating regulations. <\/p>\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p>We are proud to be the first offshore wind farm project in Poland to successfully complete this process.<\/p>\n<cite>Jens Poulsen, project manager and board member of Baltic Power.<\/cite><\/blockquote>\n\n<p>The certification validates the <strong>turbine and substation designs<\/strong> , while ensuring that the wind farm can operate in the local <strong>Baltic Sea<\/strong> conditions throughout its entire lifespan. This process is overseen by <strong><a href=\"https:\/\/inspenet.com\/en\/news\/dnv-iberdrola-marine-eolian-park\/\" data-type=\"post\" data-id=\"168317\" target=\"_blank\" rel=\"noreferrer noopener\">DNV<\/a><\/strong> , an international certification body that ensures compliance with international standards. <\/p>\n\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<iframe loading=\"lazy\" title=\"Baltic Power Update\" width=\"500\" height=\"281\" src=\"https:\/\/www.youtube.com\/embed\/WIKp8b5LHMg?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n<\/div><\/figure>\n\n<p><\/p>\n\n<p class=\"has-text-align-center\">Platform installations and energy projects. Source: Northland Power<\/p>\n\n<p>With the <strong>design conformity certificates<\/strong> obtained, the project now moves into the <strong>construction<\/strong> phase, where <strong>DNV<\/strong> will closely oversee manufacturing, installation, and operational start-up activities to ensure that all phases of the project are carried out to the highest safety and quality standards.<\/p>\n\n<p><strong>Follow us on social media and don&#8217;t miss any of our posts!<\/strong><\/p>\n\n<p id=\"block-d7e62e0a-8e87-4517-ae71-0b195fb68b4a\"><a href=\"https:\/\/www.youtube.com\/@inspenet\" rel=\"nofollow noopener\" target=\"_blank\">YouTube<\/a> <a href=\"https:\/\/www.linkedin.com\/company\/inspenetnetwork\" rel=\"nofollow noopener\" target=\"_blank\">LinkedIn<\/a> <a href=\"https:\/\/www.facebook.com\/inspenetnetwork\" rel=\"nofollow noopener\" target=\"_blank\">Facebook<\/a> <a href=\"https:\/\/www.instagram.com\/inspenet\/\" rel=\"nofollow noopener\" target=\"_blank\">Instagram<\/a> <a href=\"https:\/\/x.com\/Inspenetnetwork\" rel=\"nofollow\">X (Twitter)<\/a> <a href=\"https:\/\/www.tiktok.com\/@inspenet?_t=8qqIL6dRGNR&amp;_r=1\" rel=\"nofollow noopener\" target=\"_blank\">TikTok<\/a><\/p>\n\n<p><strong>Source and photo: <a href=\"https:\/\/balticpower.pl\/news\/baltic-power-obtains-first-design-conformity-certificates-for-an-offshore-wind-farm-in-poland\/\" target=\"_blank\" rel=\"noreferrer noopener\">Baltic Power<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>These certificates, issued by DNV, are essential to ensuring the safety and viability of the construction and operation of the offshore wind farm.<\/p>\n","protected":false},"author":8404,"featured_media":241456,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"_acf_changed":false,"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":""},"categoria_noticias":[13026,13044],"etiqueta_noticias":[],"class_list":["post-241476","noticias","type-noticias","status-publish","has-post-thumbnail","hentry","categoria_noticias-energy","categoria_noticias-new-energies"],"acf":[],"_links":{"self":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/241476","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias"}],"about":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/types\/noticias"}],"author":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/users\/8404"}],"replies":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/comments?post=241476"}],"version-history":[{"count":0,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/241476\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media\/241456"}],"wp:attachment":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media?parent=241476"}],"wp:term":[{"taxonomy":"categoria_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/categoria_noticias?post=241476"},{"taxonomy":"etiqueta_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/etiqueta_noticias?post=241476"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}