{"id":232377,"date":"2025-02-24T15:30:50","date_gmt":"2025-02-24T19:30:50","guid":{"rendered":"https:\/\/inspenet.com\/noticias\/iberdrola-spain-begins-operations-at-the-valdecanas-hydroelectric-power-plant\/"},"modified":"2025-02-24T15:45:20","modified_gmt":"2025-02-24T19:45:20","slug":"iberdrola-spain-begins-operations-at-the-valdecanas-hydroelectric-power-plant","status":"publish","type":"noticias","link":"https:\/\/inspenet.com\/en\/news\/iberdrola-spain-begins-operations-at-the-valdecanas-hydroelectric-power-plant\/","title":{"rendered":"Iberdrola Spain begins operations at the Valdeca\u00f1as hydroelectric power plant"},"content":{"rendered":"\n<p><strong>Iberdrola Spain<\/strong> has started operating the first group of the Valdeca\u00f1as pumped storage hydroelectric power plant, located in C\u00e1ceres, Extremadura. This facility has a total capacity of 225 MW and includes a 15 MW hybrid battery and 7.5 MWh of stored energy, increasing its energy storage capacity in the Tagus system to 210 GWh. <\/p>\n\n<h2 class=\"wp-block-heading\">The Valdeca\u00f1as hydroelectric power station<\/h2>\n\n<p>The <em>Valdeca\u00f1as power plant<\/em> is designed to operate as a <strong>reversible pumping system<\/strong> , allowing energy to be stored during times of low demand and released when consumption increases. This mechanism, which acts as a &#8221; <em>giant battery<\/em> &#8221; using water from the Valdeca\u00f1as and Torrej\u00f3n-Tajo reservoirs, contributes to the stability of the electricity grid without generating additional consumption of water resources. In addition, the technological improvements implemented in Group 1 will allow the pumping capacity of the facility to be fully recovered, optimising its performance.  <\/p>\n\n<p>The commissioning of this plant represents a reduction of 200,000 tons of CO\u2082 per year, in line with the objectives of decarbonisation and energy transition. In addition, it has boosted local employment, generating 165 direct jobs and up to 500 indirect jobs, benefiting small and medium-sized companies in the province of C\u00e1ceres. <\/p>\n\n<p>The development of Valdeca\u00f1as is part of <strong><a href=\"https:\/\/inspenet.com\/en\/news\/iberdrola-first-hybrid-plant-of-spain\/\" data-type=\"post\" data-id=\"100950\" target=\"_blank\" rel=\"noreferrer noopener\">Iberdrola<\/a><\/strong> &#8216;s commitment to hydroelectric storage in the Iberian Peninsula. The company has recently started similar projects in the pumping system of the T\u00e2mega power plants in Portugal, Valpara\u00edso ( <em>Zamora<\/em> ), Santiago Sil-Xares ( <em>Galicia<\/em> ) and Torrej\u00f3n ( <em>C\u00e1ceres<\/em> ). In addition, a new project in Alc\u00e1ntara, C\u00e1ceres, has obtained a <strong>favourable Environmental Impact Statement<\/strong> and permission to access the grid, consolidating the commitment to energy optimisation and emissions reduction.  <\/p>\n\n<p><strong><a href=\"https:\/\/inspenet.com\/en\/news\/sens-transforms-mines-energy-warehouses\/\" data-type=\"post\" data-id=\"149974\">Pumped storage hydroelectric plants<\/a><\/strong> represent a great solution for the energy transition by allowing better management of intermittent renewable sources. Through their rapid response capacity and independence from hydrological conditions, these facilities guarantee greater security in the electricity supply and efficient integration of clean energy into the grid. <\/p>\n\n<p><strong>Follow us on social media and don&#8217;t miss any of our posts!<\/strong><\/p>\n\n<p><a href=\"https:\/\/www.youtube.com\/@inspenet\" rel=\"nofollow noopener\" target=\"_blank\">YouTube<\/a> <a href=\"https:\/\/www.linkedin.com\/company\/inspenetnetwork\" rel=\"nofollow noopener\" target=\"_blank\">LinkedIn<\/a> <a href=\"https:\/\/www.facebook.com\/inspenetnetwork\" rel=\"nofollow noopener\" target=\"_blank\">Facebook<\/a> <a href=\"https:\/\/www.instagram.com\/inspenet\/\" rel=\"nofollow noopener\" target=\"_blank\">Instagram<\/a> <a href=\"https:\/\/x.com\/Inspenetnetwork\" rel=\"nofollow\">X(Twitter)<\/a> <a href=\"https:\/\/www.tiktok.com\/@inspenet?_t=8qqIL6dRGNR&amp;_r=1\" rel=\"nofollow noopener\" target=\"_blank\">TikTok<\/a><\/p>\n\n<p><strong>Source and photos: <a href=\"https:\/\/www.iberdrolaespana.com\/sala-comunicacion\/noticias\/detalle\/central-hidroelectrica-bombeo-valdecanas-puesta-servicio\" target=\"_blank\" rel=\"noreferrer noopener\">Iberdrola Spain<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The company has taken advantage of existing structures, ensuring sustainable integration with the environment.<\/p>\n","protected":false},"author":8404,"featured_media":232213,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"_acf_changed":false,"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":""},"categoria_noticias":[13066,13030],"etiqueta_noticias":[],"class_list":["post-232377","noticias","type-noticias","status-publish","has-post-thumbnail","hentry","categoria_noticias-electricity-generation","categoria_noticias-industry"],"acf":[],"_links":{"self":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/232377","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias"}],"about":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/types\/noticias"}],"author":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/users\/8404"}],"replies":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/comments?post=232377"}],"version-history":[{"count":0,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/232377\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media\/232213"}],"wp:attachment":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media?parent=232377"}],"wp:term":[{"taxonomy":"categoria_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/categoria_noticias?post=232377"},{"taxonomy":"etiqueta_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/etiqueta_noticias?post=232377"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}