{"id":230762,"date":"2025-02-19T10:37:47","date_gmt":"2025-02-19T14:37:47","guid":{"rendered":"https:\/\/inspenet.com\/noticias\/seatrium-begins-sea-trials-with-charybdis-in-the-us\/"},"modified":"2025-08-13T09:04:59","modified_gmt":"2025-08-13T13:04:59","slug":"seatrium-begins-sea-trials-with-charybdis-in-the-us","status":"publish","type":"noticias","link":"https:\/\/inspenet.com\/en\/news\/seatrium-begins-sea-trials-with-charybdis-in-the-us\/","title":{"rendered":"Seatrium begins sea trials with Charybdis in the US"},"content":{"rendered":"\n<p>Sea trials have officially begun for Charybdis, a <strong>pioneering US Jones Act-compliant<\/strong> <strong><a href=\"https:\/\/inspenet.com\/en\/news\/wind-peak-rotterdam-de-turbinas-eolicas\/\" data-type=\"link\" data-id=\"https:\/\/inspenet.com\/noticias\/wind-peak-rotterdam-de-turbinas-eolicas\/\" target=\"_blank\" rel=\"noreferrer noopener\">wind turbine installation vessel<\/a><\/strong> (WTIV). This breakthrough represents a significant step for the future of offshore wind projects in the country.   <\/p>\n\n\n\n<p>Built by Seatrium at its shipyard in Brownsville, Texas, this impressive vessel is designed to meet the challenges of marine renewable energy.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Features of the wind turbine installation vessel<\/h2>\n\n\n\n<p>Charybdis, commissioned by Dominion Energy, <strong>is 96% complete<\/strong> . The super-sized vessel is capable of handling <strong><a href=\"https:\/\/inspenet.com\/en\/news\/crane-install-wind-turbines-great-handle\/\" data-type=\"post\" data-id=\"142826\">wind turbines<\/a><\/strong> of up to 12 megawatts, making it one of the largest of its kind in the world.   <\/p>\n\n\n\n<p>With its imposing dimensions of 472 feet long, 184 feet wide and a depth of 38 feet, the Charybdis is equipped with a 426-foot crane <strong>capable of lifting up to 2,200 tons<\/strong> , allowing it to carry out the <strong><a href=\"https:\/\/inspenet.com\/en\/news\/turbine-installation-zhong-neng-park\/\" data-type=\"post\" data-id=\"181889\" target=\"_blank\" rel=\"noreferrer noopener\">installation of the turbines<\/a><\/strong> with maximum precision and safety.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/cdn.inspenet.com\/Charybdis-1024x576.webp\" alt=\"\" class=\"wp-image-230649\" style=\"width:684px;height:auto\" srcset=\"https:\/\/cdn.inspenet.com\/Charybdis-1024x576.webp 1024w, https:\/\/cdn.inspenet.com\/Charybdis-300x169.webp 300w, https:\/\/cdn.inspenet.com\/Charybdis-768x432.webp 768w, https:\/\/cdn.inspenet.com\/Charybdis-1536x864.webp 1536w, https:\/\/cdn.inspenet.com\/Charybdis-624x351.webp 624w, https:\/\/cdn.inspenet.com\/Charybdis.webp 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Complying with Jones Act standards<\/h2>\n\n\n\n<p>The Charybdis has successfully completed lifting and loading trials of its main crane. This vessel <strong>has been designed to meet the strict standards of the Jones Act<\/strong> and to support Dominion Energy\u2019s future domestic offshore wind projects. In particular, it is intended to support Dominion\u2019s <strong><a href=\"https:\/\/inspenet.com\/en\/news\/dominion-energy-advances-its-coastal-virginia-offshore-wind-project\/\" data-type=\"link\" data-id=\"https:\/\/inspenet.com\/noticias\/dominion-alcanza-el-50-en-proyecto-eolico\/\" target=\"_blank\" rel=\"noreferrer noopener\">Coastal Virginia Offshore<\/a><\/strong> project, scheduled for completion by the end of 2025.<\/p>\n\n\n\n<p><strong>Charybdis<\/strong> is expected to be a key pillar in the implementation of <strong><a href=\"https:\/\/inspenet.com\/en\/news\/glamox-wind-marine-projects-in-asia-glamox-wind-marine-projects-in-asia\/\" data-type=\"post\" data-id=\"139208\" target=\"_blank\" rel=\"noreferrer noopener\">offshore wind projects<\/a><\/strong> in US waters, contributing to a cleaner and more sustainable energy transition. As testing progresses, Seatrium will continue to monitor its performance and readiness to meet the high standards of the energy sector.<\/p>\n\n\n\n<p>This success is the result of a joint effort between Seatrium, Dominion Energy, and their numerous partners, who have all made it possible for Charybdis to be ready to support the growth of <strong><a href=\"https:\/\/inspenet.com\/en\/news\/offshore-wind-energy-turbine-in-new-york\/\" target=\"_blank\" data-type=\"post\" data-id=\"149375\" rel=\"noreferrer noopener\">offshore wind energy in the United States<\/a><\/strong> . <\/p>\n\n\n\n<p><strong>Follow us on social media and don&#8217;t miss any of our posts!<\/strong><\/p>\n\n\n\n<p><a href=\"https:\/\/www.youtube.com\/@inspenet\" target=\"_blank\" rel=\"noreferrer noopener\">YouTube<\/a> <a href=\"https:\/\/www.youtube.com\/@inspenet\" rel=\"nofollow noopener\" target=\"_blank\">LinkedIn<\/a> <a href=\"https:\/\/www.facebook.com\/inspenetnetwork\" rel=\"nofollow noopener\" target=\"_blank\">Facebook<\/a> <a href=\"https:\/\/www.instagram.com\/inspenet\/\" rel=\"nofollow noopener\" target=\"_blank\">Instagram<\/a> X ( <a href=\"https:\/\/www.tiktok.com\/@inspenet?_t=8qqIL6dRGNR&amp;_r=1\" rel=\"nofollow noopener\" target=\"_blank\">Twitter<\/a> <a href=\"https:\/\/x.com\/Inspenetnetwork\" rel=\"nofollow\">)<\/a> <a href=\"https:\/\/www.linkedin.com\/company\/inspenetnetwork\" target=\"_blank\" rel=\"noopener\">TikTok<\/a><\/p>\n\n\n\n<p><strong>Source and main photo: <a href=\"https:\/\/www.linkedin.com\/posts\/seatrium_weareseatrium-wtiv-activity-7297411916849627137-w5Rw?utm_source=share&amp;utm_medium=member_desktop&amp;rcm=ACoAABwDBTAB4GohX6ZtDU9YmG5cMdgez-p4kwY\" data-type=\"link\" data-id=\"https:\/\/www.linkedin.com\/posts\/seatrium_weareseatrium-wtiv-activity-7297411916849627137-w5Rw?utm_source=share&amp;utm_medium=member_desktop&amp;rcm=ACoAABwDBTAB4GohX6ZtDU9YmG5cMdgez-p4kwY\" rel=\"nofollow noopener\" target=\"_blank\">Seatrium<\/a><\/strong><\/p>\n\n\n\n<p><strong>Internal photo: Dominion Energy<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Charybdis, the world&#8217;s first Jones Act-compliant wind turbine installation vessel, begins sea trials.<\/p>\n","protected":false},"author":9014,"featured_media":230674,"menu_order":0,"comment_status":"open","ping_status":"closed","template":"","meta":{"_acf_changed":false,"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":""},"categoria_noticias":[13026,13044],"etiqueta_noticias":[],"class_list":["post-230762","noticias","type-noticias","status-publish","has-post-thumbnail","hentry","categoria_noticias-energy","categoria_noticias-new-energies"],"acf":[],"_links":{"self":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/230762","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias"}],"about":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/types\/noticias"}],"author":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/users\/9014"}],"replies":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/comments?post=230762"}],"version-history":[{"count":0,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/230762\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media\/230674"}],"wp:attachment":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media?parent=230762"}],"wp:term":[{"taxonomy":"categoria_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/categoria_noticias?post=230762"},{"taxonomy":"etiqueta_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/etiqueta_noticias?post=230762"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}