{"id":223217,"date":"2025-01-23T13:11:00","date_gmt":"2025-01-23T17:11:00","guid":{"rendered":"https:\/\/inspenet.com\/?p=223217"},"modified":"2025-01-23T11:12:47","modified_gmt":"2025-01-23T15:12:47","slug":"petrobras-extends-the-contract-for-the-fpso-cidade-de-angra-dos-reis-until-2030","status":"publish","type":"noticias","link":"https:\/\/inspenet.com\/en\/news\/petrobras-extends-the-contract-for-the-fpso-cidade-de-angra-dos-reis-until-2030\/","title":{"rendered":"Petrobras extends the contract for the FPSO Cidade de Angra dos Reis until 2030"},"content":{"rendered":"\n<p>Petrobras announced a five-year extension of the charter contract for the <strong>FPSO Cidade de Angra dos Reis<\/strong> , a key platform in the <strong><a href=\"https:\/\/inspenet.com\/en\/news\/install-platform-offshore-gas-production-platform\/\" data-type=\"post\" data-id=\"130296\" target=\"_blank\" rel=\"noreferrer noopener\">offshore production<\/a><\/strong> of the Tupi field, located in the Santos Basin, Brazil. This strategic move aligns the company with its 2025-2029 Business Plan. <\/p>\n\n<p>The contract, signed with Tupi Pilot MV22 BV and Modec Servi\u00e7os de Petr\u00f3leo do Brasil Ltda., includes significant improvements to the unit. These modifications seek to optimize production, which already <strong>exceeds 50,000 barrels per day<\/strong> , while ensuring operational safety and reducing <strong><a href=\"https:\/\/inspenet.com\/en\/articulo\/engineering-reduction-gas-emissions\/\" data-type=\"articulo\" data-id=\"73971\" target=\"_blank\" rel=\"noreferrer noopener\">greenhouse gas emissions<\/a><\/strong> .<\/p>\n\n<h2 class=\"wp-block-heading\">History and relevance of the Angra dos Reis City FPSO<\/h2>\n\n<p>Since its entry into operation in 2010, the <a href=\"https:\/\/www.modec.com\/project\/detail\/tupi.html\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>FPSO Cidade de Angra dos Reis<\/strong><\/a> has stood out as the first high-capacity floating unit in the Brazilian pre-salt layer. This project marked a key point in the country&#8217;s offshore exploration and, to this day, remains a reference in terms of technology and efficiency in the Santos Basin. <\/p>\n\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/cdn.inspenet.com\/FPSO-Cidade-de-Angra-dos-Reis-foto-1024x576.webp\" alt=\"FPSO Cidade de Angra dos Reis photo\" class=\"wp-image-223026\" style=\"width:594px;height:auto\" srcset=\"https:\/\/cdn.inspenet.com\/FPSO-Cidade-de-Angra-dos-Reis-foto-1024x576.webp 1024w, https:\/\/cdn.inspenet.com\/FPSO-Cidade-de-Angra-dos-Reis-foto-300x169.webp 300w, https:\/\/cdn.inspenet.com\/FPSO-Cidade-de-Angra-dos-Reis-foto-768x432.webp 768w, https:\/\/cdn.inspenet.com\/FPSO-Cidade-de-Angra-dos-Reis-foto-1536x864.webp 1536w, https:\/\/cdn.inspenet.com\/FPSO-Cidade-de-Angra-dos-Reis-foto-624x351.webp 624w, https:\/\/cdn.inspenet.com\/FPSO-Cidade-de-Angra-dos-Reis-foto.webp 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">The contract includes improvements to the unit. Source: MODEC <\/figcaption><\/figure>\n\n<p>The Tupi field consortium, comprised of Petrobras (67.216%), Shell (23.024%), Petrogal (9.209%) and PPSA (0.551%), has worked together to ensure the continued success of operations. The contract extension and planned improvements will not only benefit immediate production, but are aimed at ensuring the integrity of the platform until its <strong>decommissioning in 2030<\/strong> . <\/p>\n\n<p><strong>Follow us on social media and don&#8217;t miss any of our posts!<\/strong><\/p>\n\n<p><a href=\"https:\/\/www.youtube.com\/@inspenet\" rel=\"nofollow noopener\" target=\"_blank\">YouTube<\/a> <a href=\"https:\/\/www.linkedin.com\/company\/inspenetnetwork\" rel=\"nofollow noopener\" target=\"_blank\">LinkedIn<\/a> <a href=\"https:\/\/www.facebook.com\/inspenetnetwork\" rel=\"nofollow noopener\" target=\"_blank\">Facebook<\/a> <a href=\"https:\/\/www.instagram.com\/inspenet\/\" rel=\"nofollow noopener\" target=\"_blank\">Instagram<\/a> <a href=\"https:\/\/x.com\/Inspenetnetwork\" rel=\"nofollow\">X<\/a> <a href=\"https:\/\/www.tiktok.com\/@inspenet?_t=8qqIL6dRGNR&amp;_r=1\" rel=\"nofollow noopener\" target=\"_blank\">TikTok<\/a><\/p>\n\n<p><strong>Source and main photo: <a href=\"https:\/\/agencia.petrobras.com.br\/w\/negocio\/petrobras-informa-sobre-extensao-da-producao-do-fpso-cidade-de-angra-dos-reis-no-campo-de-tupi\" target=\"_blank\" rel=\"noopener\">Petro<\/a> <a href=\"https:\/\/agencia.petrobras.com.br\/w\/negocio\/petrobras-informa-sobre-extensao-da-producao-do-fpso-cidade-de-angra-dos-reis-no-campo-de-tupi\" target=\"_blank\" rel=\"noreferrer noopener\">b<\/a> <a href=\"https:\/\/agencia.petrobras.com.br\/w\/negocio\/petrobras-informa-sobre-extensao-da-producao-do-fpso-cidade-de-angra-dos-reis-no-campo-de-tupi\" target=\"_blank\" rel=\"noopener\">ras<\/a> <\/strong><\/p>\n\n<p><strong>Internal photo: MODEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The FPSO is one of the first high-capacity floating units in the Brazilian pre-salt layer.<\/p>\n","protected":false},"author":8403,"featured_media":223054,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"_acf_changed":false,"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":""},"categoria_noticias":[13026,13036],"etiqueta_noticias":[],"class_list":["post-223217","noticias","type-noticias","status-publish","has-post-thumbnail","hentry","categoria_noticias-energy","categoria_noticias-oil-and-gas"],"acf":[],"_links":{"self":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/223217","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias"}],"about":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/types\/noticias"}],"author":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/users\/8403"}],"replies":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/comments?post=223217"}],"version-history":[{"count":0,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/223217\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media\/223054"}],"wp:attachment":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media?parent=223217"}],"wp:term":[{"taxonomy":"categoria_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/categoria_noticias?post=223217"},{"taxonomy":"etiqueta_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/etiqueta_noticias?post=223217"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}