{"id":208821,"date":"2024-11-22T20:04:47","date_gmt":"2024-11-23T00:04:47","guid":{"rendered":"https:\/\/inspenet.com\/noticias\/edda-wind-takes-delivery-of-its-new-zero-emission-csov-vessel-vestri-enable\/"},"modified":"2024-11-23T21:07:45","modified_gmt":"2024-11-24T01:07:45","slug":"edda-wind-takes-delivery-of-its-new-zero-emission-csov-vessel-vestri-enable","status":"publish","type":"noticias","link":"https:\/\/inspenet.com\/en\/news\/edda-wind-takes-delivery-of-its-new-zero-emission-csov-vessel-vestri-enable\/","title":{"rendered":"Edda Wind takes delivery of its new zero-emission CSOV vessel &#8220;Vestri Enable&#8221;"},"content":{"rendered":"\n<p>On November 14, the <strong>Edda Wind<\/strong> company celebrated the official delivery of the \u201c <em>Vestri Enabler<\/em> \u201d, its last operational service vessel ( <em>CSOV<\/em> ), built by Astilleros Gond\u00e1n in Spain, which meets high efficiency standards with zero emissions.<\/p>\n\n<h2 class=\"wp-block-heading\">The new emission-free CSOV vessel<\/h2>\n\n<p>The naming ceremony, held in Gij\u00f3n the following day, was attended by Cr\u00e9dit Agricole CIB&#8217;s Global Director of Energy and Real Estate, Danielle Baron, who acted as the event&#8217;s patron to celebrate the event.<\/p>\n\n<p>The Vestri Enabler is part of a series of vessels specifically designed to operate in offshore wind farms. Measuring 88.3 metres in length, the <strong><a href=\"https:\/\/inspenet.com\/en\/news\/olympic-incorpora-buque-olympic-notos-flota\/\" target=\"_blank\" data-type=\"post\" data-id=\"206110\" rel=\"noreferrer noopener\">CSOV<\/a><\/strong> incorporates state-of-the-art technology, including a <strong>liquid hydrogen-based propulsion system<\/strong> (LOHC) that enables zero-emission operations. <\/p>\n\n<p>In addition, it has the capacity to accommodate up to 120 people, including technicians and official crew, which positions it as a crucial node for maritime operations for the start-up and maintenance of offshore wind turbines, as well as other applications.<\/p>\n\n<p>This vessel exemplifies <strong>Edda Wind\u2019s commitment<\/strong> to sustainability, offering operational solutions that drastically reduce carbon emissions. In addition, its optimized design allows for maximizing operational efficiency in wind farms, setting a new standard in the industry. <\/p>\n\n<p>The \u201c <em>Vestri Enabler<\/em> \u201d is named after Vestri, one of the four dwarves in Norse mythology who hold up the sky. This is the third ship in the series, preceded by the \u201c <em>Nordri Enabler<\/em> \u201d and the \u201c <em>Sudri Enabler<\/em> \u201d, delivered in September 2023 and July 2024, respectively. <\/p>\n\n<p>Following completion of trials in the UK, Vestri Enabler will begin an initial four-month contract, with options for extension. This deployment will mark the start of its contribution to the growing offshore wind market, an important industry in the transition to renewable energy sources. <\/p>\n\n<p><strong>Follow us on social media and don&#8217;t miss any of our posts!<\/strong><\/p>\n\n<p><a href=\"https:\/\/www.youtube.com\/@inspenet\" target=\"_blank\" rel=\"noreferrer noopener\">YouTube<\/a> <a href=\"https:\/\/www.linkedin.com\/company\/inspenetnetwork\" target=\"_blank\" rel=\"noreferrer noopener\">LinkedIn<\/a> <a href=\"https:\/\/www.facebook.com\/inspenetnetwork\" target=\"_blank\" rel=\"noreferrer noopener\">Facebook<\/a> <a href=\"https:\/\/www.instagram.com\/inspenet\/\" target=\"_blank\" rel=\"noreferrer noopener\">Instagram<\/a> <a href=\"https:\/\/x.com\/Inspenetnetwork\" target=\"_blank\" rel=\"noreferrer noopener\">X<\/a> <a href=\"https:\/\/www.tiktok.com\/@inspenet?_t=8qqIL6dRGNR&amp;_r=1\" target=\"_blank\" rel=\"noreferrer noopener\">TikTok<\/a><\/p>\n\n<p><strong>Source and photos:<\/strong> <strong><a href=\"https:\/\/eddawind.com\/delivery-and-naming-ceremony-for-vestri-enabler\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">Edda Wind<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The CSOV vessel has the capacity to accommodate up to 120 people, including technicians and official crew, very useful for the maintenance of offshore wind turbines.<\/p>\n","protected":false},"author":8404,"featured_media":208805,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"_acf_changed":false,"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":""},"categoria_noticias":[13026,13048],"etiqueta_noticias":[],"class_list":["post-208821","noticias","type-noticias","status-publish","has-post-thumbnail","hentry","categoria_noticias-energy","categoria_noticias-maritime"],"acf":[],"_links":{"self":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/208821","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias"}],"about":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/types\/noticias"}],"author":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/users\/8404"}],"replies":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/comments?post=208821"}],"version-history":[{"count":0,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/208821\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media\/208805"}],"wp:attachment":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media?parent=208821"}],"wp:term":[{"taxonomy":"categoria_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/categoria_noticias?post=208821"},{"taxonomy":"etiqueta_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/etiqueta_noticias?post=208821"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}