{"id":201661,"date":"2024-11-01T14:36:14","date_gmt":"2024-11-01T18:36:14","guid":{"rendered":"https:\/\/inspenet.com\/noticias\/fpso-marechal-duque-caxias-first-petroleum\/"},"modified":"2024-11-01T14:42:35","modified_gmt":"2024-11-01T18:42:35","slug":"fpso-marechal-duque-caxias-first-petroleum","status":"publish","type":"noticias","link":"https:\/\/inspenet.com\/en\/news\/fpso-marechal-duque-caxias-first-petroleum\/","title":{"rendered":"FPSO Marechal Duque de Caxias obtains its first oil in Brazil"},"content":{"rendered":"\n<p>MISC Group celebrates an important achievement with the <strong>first oil production from the FPSO <a href=\"https:\/\/inspenet.com\/en\/news\/fpso-marechal-duque-de-caxias-llego-brasil-fpso-marechal-duque-de-caxias-llego-brasil\/\">Marechal Duque de Caxias<\/a><\/strong> , its floating production, storage and offloading unit, which will operate in the Mero field, in the Santos Basin, Brazil.<\/p>\n\n<p>This <strong><a href=\"https:\/\/inspenet.com\/en\/news\/they-elevated-module-m10-in-fpso-energean-power\/\" data-type=\"post\" data-id=\"200870\" target=\"_blank\" rel=\"noreferrer noopener\">FPSO<\/a><\/strong> , one of the largest of its kind, was developed to operate efficiently in ultra-deep waters, providing sustained production flow and supporting the country&#8217;s energy goals.<\/p>\n\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/cdn.inspenet.com\/El-FPSO-Marechal-Duque-de-Caxias-obtiene-su-primer-petroleo-1-1024x576.webp\" alt=\"First oil in Brazil\" class=\"wp-image-201630\" style=\"width:616px;height:auto\" srcset=\"https:\/\/cdn.inspenet.com\/El-FPSO-Marechal-Duque-de-Caxias-obtiene-su-primer-petroleo-1-1024x576.webp 1024w, https:\/\/cdn.inspenet.com\/El-FPSO-Marechal-Duque-de-Caxias-obtiene-su-primer-petroleo-1-300x169.webp 300w, https:\/\/cdn.inspenet.com\/El-FPSO-Marechal-Duque-de-Caxias-obtiene-su-primer-petroleo-1-768x432.webp 768w, https:\/\/cdn.inspenet.com\/El-FPSO-Marechal-Duque-de-Caxias-obtiene-su-primer-petroleo-1-1536x864.webp 1536w, https:\/\/cdn.inspenet.com\/El-FPSO-Marechal-Duque-de-Caxias-obtiene-su-primer-petroleo-1-624x351.webp 624w, https:\/\/cdn.inspenet.com\/El-FPSO-Marechal-Duque-de-Caxias-obtiene-su-primer-petroleo-1.webp 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">FPSO Marechal Duque de Caxias. Source: Petrobras<\/figcaption><\/figure>\n\n<p>Equipped with HISEP technology for <strong>CO\u2082 reinjection<\/strong> and a water-alternating production system (WAG), the Duque de Caxias FPSO optimizes the capture and management of <strong><a href=\"https:\/\/inspenet.com\/en\/news\/nasa-greenhouse-gas-plume-s\/\" data-type=\"post\" data-id=\"195235\" target=\"_blank\" rel=\"noreferrer noopener\">greenhouse gases<\/a><\/strong> . This technological innovation allows the separation of CO\u2082-rich gas from the production stream, <strong>reducing emissions<\/strong> and ensuring the sustainability of the process. In addition, it features a real-time monitoring system and predictive maintenance systems, ensuring efficient operation and extended lifespan.  <\/p>\n\n<h2 class=\"wp-block-heading\">Celebrating the first oil from the FPSO<\/h2>\n\n<p>Zahid Osman, President and CEO of MISC Group, acknowledged the team\u2019s dedication and collaboration with <strong><a href=\"https:\/\/agencia.petrobras.com.br\/w\/negocio\/navio-plataforma-marechal-duque-de-caxias-comeca-a-produzir-no-pre-sal\" target=\"_blank\" rel=\"noreferrer noopener\">Petrobras<\/a><\/strong> and its partners, emphasizing:<\/p>\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p>This first oil is a testament to our ability and commitment to deliver efficient energy solutions in a highly competitive environment. This achievement demonstrates our role in the energy transition and reinforces our commitment to sustainability in the oil and gas industry. <\/p>\n<\/blockquote>\n\n<p>With <strong>a production capacity of up to 180,000 barrels per day and storage for 1.4 million barrels<\/strong> , the Marechal Duque de Caxias FPSO will strengthen Petrobras&#8217; production and contribute to Brazil&#8217;s energy security in the coming years. This first oil harvest is a key step towards responsible and sustainable energy production in the region. <\/p>\n\n<p><strong>Follow us on social media and don&#8217;t miss any of our posts!<\/strong><\/p>\n\n<p><a href=\"https:\/\/www.youtube.com\/@inspenet\" target=\"_blank\" rel=\"noreferrer noopener\">YouTube<\/a> <a href=\"https:\/\/www.linkedin.com\/company\/inspenetnetwork\" target=\"_blank\" rel=\"noreferrer noopener\">LinkedIn<\/a> <a href=\"https:\/\/www.facebook.com\/inspenetnetwork\" target=\"_blank\" rel=\"noreferrer noopener\">Facebook<\/a> <a href=\"https:\/\/www.instagram.com\/inspenet\/\" target=\"_blank\" rel=\"noreferrer noopener\">Instagram<\/a> <a href=\"https:\/\/x.com\/Inspenetnetwork\" target=\"_blank\" rel=\"noreferrer noopener\">X<\/a> <a href=\"https:\/\/www.tiktok.com\/@inspenet?_t=8qqIL6dRGNR&amp;_r=1\" target=\"_blank\" rel=\"noreferrer noopener\">TikTok<\/a><\/p>\n\n<p><strong>Source: <a href=\"https:\/\/www.miscgroup.com\/media\/media-releases\/misc-group-hits-major-milestone-with-first-oil-for-fpso-marechal-duque-de-caxias\" target=\"_blank\" rel=\"noreferrer noopener\">MISC Group<\/a><\/strong><\/p>\n\n<p><strong>Photos: MISC Group | Petrobras<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Its production capacity is 180,000 barrels per day and its CO\u2082 reinjection technology supports sustainability in the oil industry.<\/p>\n","protected":false},"author":8403,"featured_media":201615,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"_acf_changed":false,"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":""},"categoria_noticias":[13026,13036],"etiqueta_noticias":[],"class_list":["post-201661","noticias","type-noticias","status-publish","has-post-thumbnail","hentry","categoria_noticias-energy","categoria_noticias-oil-and-gas"],"acf":[],"_links":{"self":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/201661","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias"}],"about":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/types\/noticias"}],"author":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/users\/8403"}],"replies":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/comments?post=201661"}],"version-history":[{"count":0,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/201661\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media\/201615"}],"wp:attachment":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media?parent=201661"}],"wp:term":[{"taxonomy":"categoria_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/categoria_noticias?post=201661"},{"taxonomy":"etiqueta_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/etiqueta_noticias?post=201661"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}