{"id":201011,"date":"2024-10-30T15:45:42","date_gmt":"2024-10-30T19:45:42","guid":{"rendered":"https:\/\/inspenet.com\/noticias\/they-elevated-module-m10-in-fpso-energean-power\/"},"modified":"2024-10-30T16:49:16","modified_gmt":"2024-10-30T20:49:16","slug":"they-elevated-module-m10-in-fpso-energean-power","status":"publish","type":"noticias","link":"https:\/\/inspenet.com\/en\/news\/they-elevated-module-m10-in-fpso-energean-power\/","title":{"rendered":"Lifting of the M10 module marks a step forward for the Energean Power FPSO"},"content":{"rendered":"\n<p>The M10 module of Energean Power\u2019s second oil train is now lifted and in position on the <strong>Energean Power FPSO<\/strong> . The operation, executed in collaboration with Israeli authorities and specialized contractors, was carried out following unloading at the port of Limassol and required precise coordination of work teams in the Mediterranean maritime environment. <\/p>\n\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<iframe loading=\"lazy\" title=\"M10 2nd oil train lift - Energean Power FPSO\" width=\"422\" height=\"750\" src=\"https:\/\/www.youtube.com\/embed\/1nJTiwxkSRI?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n<\/div><\/figure>\n\n<p><\/p>\n\n<p class=\"has-text-align-center\">Moment of the module&#8217;s elevation. Source: Energean   <\/p>\n\n<h2 class=\"wp-block-heading\">The performance of the Energean Power FPSO  <\/h2>\n\n<p>This achievement boosts Energean&#8217;s capacity in the region to expand liquids production, with <strong>a target of 20-25 thousand barrels of oil per day<\/strong> projected for the second half of 2025. The installation and commissioning of this module, estimated to take six months, are crucial to <strong>optimise the performance of the Energean Power FPSO<\/strong> and improve the supply of safe and reliable energy. <\/p>\n\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/cdn.inspenet.com\/Elevacion-del-modulo-M10-en-el-FPSO-Energean-Power-1024x576.webp\" alt=\"Energean Power FPSO performance\" class=\"wp-image-200908\" style=\"width:686px;height:auto\" srcset=\"https:\/\/cdn.inspenet.com\/Elevacion-del-modulo-M10-en-el-FPSO-Energean-Power-1024x576.webp 1024w, https:\/\/cdn.inspenet.com\/Elevacion-del-modulo-M10-en-el-FPSO-Energean-Power-300x169.webp 300w, https:\/\/cdn.inspenet.com\/Elevacion-del-modulo-M10-en-el-FPSO-Energean-Power-768x432.webp 768w, https:\/\/cdn.inspenet.com\/Elevacion-del-modulo-M10-en-el-FPSO-Energean-Power-1536x864.webp 1536w, https:\/\/cdn.inspenet.com\/Elevacion-del-modulo-M10-en-el-FPSO-Energean-Power-624x351.webp 624w, https:\/\/cdn.inspenet.com\/Elevacion-del-modulo-M10-en-el-FPSO-Energean-Power.webp 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">The expansion of the FPSO is significant. Source: Energean   <\/figcaption><\/figure>\n\n<p>Energean, a leader in natural gas exploration and production in the Eastern Mediterranean and North Sea, reaffirms its commitment to regional energy security by completing this stage of the project.<\/p>\n\n<p>This expansion of the FPSO, one of the most significant of its kind in the Mediterranean, strengthens the <strong><a href=\"https:\/\/inspenet.com\/en\/news\/fpso-maria-quiteria-produced-first-oil\/\" target=\"_blank\" data-type=\"post\" data-id=\"196665\" rel=\"noreferrer noopener\">oil production<\/a><\/strong> infrastructure and highlights the company&#8217;s ability to operate in synergy with different sectors, boosting both the economy and energy security in the region.<\/p>\n\n<p><strong>Follow us on social media and don&#8217;t miss any of our posts!<\/strong><\/p>\n\n<p><a href=\"https:\/\/www.youtube.com\/@inspenet\" target=\"_blank\" rel=\"noreferrer noopener\">YouTube<\/a> <a href=\"https:\/\/www.linkedin.com\/company\/inspenetnetwork\" target=\"_blank\" rel=\"noreferrer noopener\">LinkedIn<\/a> <a href=\"https:\/\/www.facebook.com\/inspenetnetwork\" target=\"_blank\" rel=\"noreferrer noopener\">Facebook<\/a> <a href=\"https:\/\/www.instagram.com\/inspenet\/\" target=\"_blank\" rel=\"noreferrer noopener\">Instagram<\/a> <a href=\"https:\/\/x.com\/Inspenetnetwork\" target=\"_blank\" rel=\"noreferrer noopener\">X<\/a> <a href=\"https:\/\/www.tiktok.com\/@inspenet?_t=8qqIL6dRGNR&amp;_r=1\" target=\"_blank\" rel=\"noreferrer noopener\">TikTok<\/a><\/p>\n\n<p><strong>Source and photos:<\/strong> <strong><a href=\"https:\/\/www.energean.com\/media\/5906\/successful-lift-of-the-m10-2nd-oil-train-module-to-the-energean-power-fpso.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">Energean<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>With this advance, an increase of up to 25 thousand barrels per day is projected in 2025.<\/p>\n","protected":false},"author":8403,"featured_media":200897,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"_acf_changed":false,"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":""},"categoria_noticias":[13026,13036],"etiqueta_noticias":[],"class_list":["post-201011","noticias","type-noticias","status-publish","has-post-thumbnail","hentry","categoria_noticias-energy","categoria_noticias-oil-and-gas"],"acf":[],"_links":{"self":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/201011","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias"}],"about":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/types\/noticias"}],"author":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/users\/8403"}],"replies":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/comments?post=201011"}],"version-history":[{"count":0,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/201011\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media\/200897"}],"wp:attachment":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media?parent=201011"}],"wp:term":[{"taxonomy":"categoria_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/categoria_noticias?post=201011"},{"taxonomy":"etiqueta_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/etiqueta_noticias?post=201011"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}