{"id":200502,"date":"2024-10-29T12:03:06","date_gmt":"2024-10-29T16:03:06","guid":{"rendered":"https:\/\/inspenet.com\/noticias\/mega-jack-5200-reduced-work-on-platform\/"},"modified":"2024-10-29T13:57:42","modified_gmt":"2024-10-29T17:57:42","slug":"mega-jack-5200-reduced-work-on-platform","status":"publish","type":"noticias","link":"https:\/\/inspenet.com\/en\/news\/mega-jack-5200-reduced-work-on-platform\/","title":{"rendered":"Mammoet reduces downtime on Noble Regina Allen platform"},"content":{"rendered":"\n<p>In the <strong><a href=\"https:\/\/inspenet.com\/en\/news\/philippines-vessel-campana-drilling-offshore\/\" target=\"_blank\" data-type=\"post\" data-id=\"140441\" rel=\"noreferrer noopener\">offshore drilling<\/a><\/strong> industry, reducing operational downtime is crucial. For the Noble Regina Allen jack-up rig owned by Noble Corporation, <strong>Mammoet deployed its innovative Mega Jack 5200 system<\/strong> as a core solution to streamline the repair and modernisation process, at the request of Damen Shiprepair. <\/p>\n\n<p>The repair required an advanced lifting technique <strong>that could support the 22,000-ton platform<\/strong> , lifting it safely and accurately. The Mega Jack 5200, designed by <strong><a href=\"https:\/\/inspenet.com\/en\/news\/worlds-strongest-land-crane-sk6000\/\" data-type=\"post\" data-id=\"192295\" target=\"_blank\" rel=\"noreferrer noopener\">Mammoet<\/a><\/strong> for large-scale jobs, stood out as the best option against other alternatives. <\/p>\n\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/cdn.inspenet.com\/elevacion-nocturna-de-la-plataforma-Noble-Regina-Allen-1024x576.webp\" alt=\"Noble Regina Allen's Night Rise\" class=\"wp-image-200487\" style=\"width:692px;height:auto\" srcset=\"https:\/\/cdn.inspenet.com\/elevacion-nocturna-de-la-plataforma-Noble-Regina-Allen-1024x576.webp 1024w, https:\/\/cdn.inspenet.com\/elevacion-nocturna-de-la-plataforma-Noble-Regina-Allen-300x169.webp 300w, https:\/\/cdn.inspenet.com\/elevacion-nocturna-de-la-plataforma-Noble-Regina-Allen-768x432.webp 768w, https:\/\/cdn.inspenet.com\/elevacion-nocturna-de-la-plataforma-Noble-Regina-Allen-1536x864.webp 1536w, https:\/\/cdn.inspenet.com\/elevacion-nocturna-de-la-plataforma-Noble-Regina-Allen-624x351.webp 624w, https:\/\/cdn.inspenet.com\/elevacion-nocturna-de-la-plataforma-Noble-Regina-Allen.webp 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Night elevation of the Noble Regina Allen platform. Source: Mammoet <\/figcaption><\/figure>\n\n<p>This lifting system, consisting of six towers with an individual capacity of 5,200 tons, <strong>made it possible to lift the platform up to 35 meters<\/strong> , enough to carry out repairs from the base with a practical and safe approach.<\/p>\n\n<h2 class=\"wp-block-heading\">Mega Jack 5200 speeds up offshore repair<\/h2>\n\n<p>According to Ruud Jansen, the company&#8217;s sales director, the <strong><a href=\"https:\/\/www.mammoet.com\/equipment\/special-equipment\/jacking-systems\/mega-jack-5200\/\" data-type=\"link\" data-id=\"https:\/\/www.mammoet.com\/equipment\/special-equipment\/jacking-systems\/mega-jack-5200\/\" target=\"_blank\" rel=\"noreferrer noopener\">Mega Jack 5200<\/a><\/strong> was selected for its rapid assembly capabilities and flexibility to adapt to the project environment, <strong>reducing set-up time and ensuring agile execution<\/strong> .<\/p>\n\n<iframe loading=\"lazy\" src=\"https:\/\/www.linkedin.com\/embed\/feed\/update\/urn:li:ugcPost:7256943733344989184?compact=1\" height=\"399\" width=\"710\" frameborder=\"0\" allowfullscreen=\"\" title=\"Embedded post\"><\/iframe>\n\n<p><\/p>\n\n<p class=\"has-text-align-center\">Repairs to the Noble Regina Allen jack-up platform. Source: Damen Shiprepair <\/p>\n\n<p>The damaged section of the 70-metre-high platform leg was split into two parts and placed under the elevated structure using <strong><a href=\"https:\/\/inspenet.com\/en\/news\/hsm-and-the-n05-a-platform-of-one-dyas\/\" data-type=\"post\" data-id=\"177246\">self-propelled modular transporters<\/a><\/strong> (SPMT). This operation enabled the sections to be assembled and welded quickly, restoring the platform&#8217;s functionality. <\/p>\n\n<p>In a <strong>record time of three months, this system enabled the repair to be completed<\/strong> , <strong><a href=\"https:\/\/www.linkedin.com\/posts\/mammoet_mammoet-offshore-shiprepair-activity-7256607645967568898-Vkdh?utm_source=share&amp;utm_medium=member_desktop\" data-type=\"link\" data-id=\"https:\/\/www.linkedin.com\/posts\/mammoet_mammoet-offshore-shiprepair-activity-7256607645967568898-Vkdh?utm_source=share&amp;utm_medium=member_desktop\" rel=\"nofollow noopener\" target=\"_blank\">minimising the downtime of the Noble Regina Allen<\/a><\/strong> . Both companies demonstrated how advanced lifting solutions can optimise maintenance on drilling platforms, achieving a rapid return to operations and showcasing the efficiency of cutting-edge technologies in the maritime industry.   <\/p>\n\n<p><strong>Follow us on social media and don&#8217;t miss any of our posts!<\/strong><\/p>\n\n<p><a href=\"https:\/\/www.youtube.com\/@inspenet\" target=\"_blank\" rel=\"noreferrer noopener\">YouTube<\/a> <a href=\"https:\/\/www.linkedin.com\/company\/inspenetnetwork\" target=\"_blank\" rel=\"noreferrer noopener\">LinkedIn<\/a> <a href=\"https:\/\/www.facebook.com\/inspenetnetwork\" target=\"_blank\" rel=\"noreferrer noopener\">Facebook<\/a> <a href=\"https:\/\/www.instagram.com\/inspenet\/\" target=\"_blank\" rel=\"noreferrer noopener\">Instagram<\/a> <a href=\"https:\/\/x.com\/Inspenetnetwork\" target=\"_blank\" rel=\"noreferrer noopener\">X<\/a> <a href=\"https:\/\/www.tiktok.com\/@inspenet?_t=8qqIL6dRGNR&amp;_r=1\" target=\"_blank\" rel=\"noreferrer noopener\">TikTok<\/a><\/p>\n\n<p><strong>Source and photos: <a href=\"https:\/\/www.mammoet.com\/cases\/drilling-rig-downtime-reduced-using-mega-jack-5200\/\" data-type=\"link\" data-id=\"https:\/\/www.mammoet.com\/cases\/drilling-rig-downtime-reduced-using-mega-jack-5200\/\" target=\"_blank\" rel=\"noreferrer noopener\">Mammoet<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Mega Jack 5200 system lifted the platform to a height of 35 metres in just three months.<\/p>\n","protected":false},"author":9014,"featured_media":200486,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"_acf_changed":false,"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":""},"categoria_noticias":[13026,13036],"etiqueta_noticias":[],"class_list":["post-200502","noticias","type-noticias","status-publish","has-post-thumbnail","hentry","categoria_noticias-energy","categoria_noticias-oil-and-gas"],"acf":[],"_links":{"self":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/200502","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias"}],"about":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/types\/noticias"}],"author":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/users\/9014"}],"replies":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/comments?post=200502"}],"version-history":[{"count":0,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/200502\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media\/200486"}],"wp:attachment":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media?parent=200502"}],"wp:term":[{"taxonomy":"categoria_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/categoria_noticias?post=200502"},{"taxonomy":"etiqueta_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/etiqueta_noticias?post=200502"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}