{"id":199380,"date":"2024-10-25T13:58:42","date_gmt":"2024-10-25T17:58:42","guid":{"rendered":"https:\/\/inspenet.com\/noticias\/van-oords-cable-ship-calypso\/"},"modified":"2024-10-25T14:21:39","modified_gmt":"2024-10-25T18:21:39","slug":"van-oords-cable-ship-calypso","status":"publish","type":"noticias","link":"https:\/\/inspenet.com\/en\/news\/van-oords-cable-ship-calypso\/","title":{"rendered":"Van Oord&#8217;s Calypso cable ship makes debut at Sofia offshore wind project"},"content":{"rendered":"\n<p>The recent launch of the new <strong>cable laying vessel Calypso<\/strong> is a sign of <strong>Van Oord<\/strong> \u2019s progress in the offshore wind industry. This specialised vessel operates in the <strong>Sofia offshore wind farm<\/strong> in the UK and is notable for its capabilities in HVDC cable installation and other related services. <\/p>\n\n<h2 class=\"wp-block-heading\">Van Oord&#8217;s cable ship Calypso<\/h2>\n\n<p>The vessel is equipped with two cable carousels and has a capacity of up to 8,000 tonnes, and the Calypso has the ability to lay two DC cables simultaneously, increasing efficiency on large-scale projects.<\/p>\n\n<p>The <strong>Calypso vessel&#8217;s advanced technology<\/strong> , including a hybrid system that allows it to operate on biofuel and is ready for e-fuels, reinforces the company&#8217;s commitment to sustainability. This vessel joins <strong>Nexus<\/strong> , another cable ship, thus consolidating the company&#8217;s position as a leader in the development of sustainable marine infrastructure. <\/p>\n\n<p>The <strong><a href=\"https:\/\/inspenet.com\/en\/news\/calypso-ship-is-preparing-sofia-wind-farm\/\" target=\"_blank\" data-type=\"post\" data-id=\"187520\" rel=\"noreferrer noopener\">Sofia wind farm<\/a><\/strong> , located on <em>Dogger Bank<\/em> 195 kilometres off the north-east coast of the United Kingdom, is one of the largest projects in the global offshore wind sector. With a projected capacity of 1.4 GW, this facility will supply clean energy to more than one million homes in the country. The initiative is managed by the company, which leads the design, construction and installation of network cables, covering approximately 360 kilometres of cables at sea.  <\/p>\n\n<iframe loading=\"lazy\" src=\"https:\/\/www.linkedin.com\/embed\/feed\/update\/urn:li:ugcPost:7255129216600436736?compact=1\" height=\"399\" width=\"710\" frameborder=\"0\" allowfullscreen=\"\" title=\"Embedded post\"><\/iframe>\n\n<p>The Managing Director of Offshore Energy at <strong>Van Oord<\/strong> , Arnoud Kuis, comments: \u201c<em>With Calypso in full operation, our cable installation fleet has reached a new level. This technological investment supports our commitment to innovation and to offering sustainable solutions in the competitive marine energy market. <\/em>\u201d<\/p>\n\n<p><strong>Follow us on social media and don&#8217;t miss any of our posts!<\/strong><\/p>\n\n<p><a href=\"https:\/\/www.youtube.com\/@inspenet\" target=\"_blank\" rel=\"noreferrer noopener\">YouTube<\/a> <a href=\"https:\/\/www.linkedin.com\/company\/inspenetnetwork\" target=\"_blank\" rel=\"noreferrer noopener\">LinkedIn<\/a> <a href=\"https:\/\/www.facebook.com\/inspenetnetwork\" target=\"_blank\" rel=\"noreferrer noopener\">Facebook<\/a> <a href=\"https:\/\/www.instagram.com\/inspenet\/\" target=\"_blank\" rel=\"noreferrer noopener\">Instagram<\/a> <a href=\"https:\/\/x.com\/Inspenetnetwork\" target=\"_blank\" rel=\"noreferrer noopener\">X<\/a> <a href=\"https:\/\/www.tiktok.com\/@inspenet?_t=8qqIL6dRGNR&amp;_r=1\" target=\"_blank\" rel=\"noreferrer noopener\">TikTok<\/a><\/p>\n\n<p><strong>Source and photo:<\/strong> <strong><a href=\"https:\/\/www.vanoord.com\/en\/updates\/van-oords-cable-laying-vessel-calypso-makes-its-debut-and-now-fully-operational\/\" target=\"_blank\" rel=\"noreferrer noopener\">Van Oord<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>With its debut in Sofia Park, the Calypso projects improvements in the wind industry, positioning itself as a benchmark in technology and sustainability on the high seas.<\/p>\n","protected":false},"author":8404,"featured_media":199329,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"_acf_changed":false,"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":""},"categoria_noticias":[13026,13048],"etiqueta_noticias":[],"class_list":["post-199380","noticias","type-noticias","status-publish","has-post-thumbnail","hentry","categoria_noticias-energy","categoria_noticias-maritime"],"acf":[],"_links":{"self":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/199380","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias"}],"about":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/types\/noticias"}],"author":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/users\/8404"}],"replies":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/comments?post=199380"}],"version-history":[{"count":0,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/199380\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media\/199329"}],"wp:attachment":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media?parent=199380"}],"wp:term":[{"taxonomy":"categoria_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/categoria_noticias?post=199380"},{"taxonomy":"etiqueta_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/etiqueta_noticias?post=199380"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}