{"id":189961,"date":"2024-09-22T20:10:00","date_gmt":"2024-09-23T00:10:00","guid":{"rendered":"https:\/\/inspenet.com\/?p=189961"},"modified":"2024-09-22T12:22:13","modified_gmt":"2024-09-22T16:22:13","slug":"equinor-abandon-blue-hydrogen-pipeline","status":"publish","type":"noticias","link":"https:\/\/inspenet.com\/en\/news\/equinor-abandon-blue-hydrogen-pipeline\/","title":{"rendered":"Equinor halts hydrogen pipeline to Germany due to lack of viability"},"content":{"rendered":"\n<p>The energy company, <strong>Equinor<\/strong>, has suspended planning for its hydrogen pipeline connecting Norway and Germany.\nThis project, valued at between 4 and 6 billion euros, was seen as key to transporting <strong>blue hydrogen<\/strong> to Germany, but lack of solid demand and regulatory transparency has blocked progress. <\/p>\n\n<h2 class=\"wp-block-heading\">Hydrogen pipeline suspension<\/h2>\n\n<p>The pipeline was to export hydrogen produced from Norwegian natural gas, using <strong>carbon capture and storage<\/strong><em>(CCS<\/em>) technologies to reduce emissions.\nHowever, changes in German energy strategy and uncertainty about the use of hydrogen in industrial sectors, such as steel and power, have made the project not commercially viable at this stage. <\/p>\n\n<p>Magnus Frantzen Eidsvold, Equinor&#8217;s representative, explained: &#8220;<em>We cannot invest billions of euros without having secured markets and long-term contracts<\/em>&#8220;.\nThe company had originally signed an agreement with RWE to supply its plants with hydrogen, but these plans have been put on hold following the latest statements. <\/p>\n\n<p>The Norwegian offshore pipeline operator, <strong><a href=\"https:\/\/gassco.eu\/en\/barentsrapporten\/\" data-type=\"link\" data-id=\"https:\/\/gassco.eu\/en\/barentsrapporten\/\" target=\"_blank\" rel=\"noreferrer noopener\">Gassco<\/a><\/strong>had indicated that the project was technically feasible.\nHowever, it remains up in the air whether it will be developed without Equinor&#8217;s support.\nThe planned capacity of the pipeline was 10 GW by 2038, which translated to transporting 2.6 million tons of hydrogen annually to the European market.  <\/p>\n\n<p>Despite this setback, Equinor will continue to explore other hydrogen projects in the <strong><a href=\"https:\/\/inspenet.com\/en\/news\/wood-and-centrica-storage-team-up-to-power-next-generation-hydrogen-production\/\" data-type=\"post\" data-id=\"87491\" target=\"_blank\" rel=\"noreferrer noopener\">hydrogen projects, particularly in the<\/a><\/strong>particularly in the United Kingdom and the Netherlands, where market conditions are more favorable.\nIn addition, RWE has indicated that its plans for hydrogen-ready power plants in Germany remain on track, although the hydrogen will have to be procured from within the continent. <\/p>\n\n<p><strong>Follow us on social networks and don&#8217;t miss any of our publications!<\/strong><\/p>\n\n<p><a href=\"https:\/\/www.youtube.com\/@inspenet\" target=\"_blank\" rel=\"noreferrer noopener\">YouTube<\/a> <a href=\"https:\/\/www.linkedin.com\/company\/inspenetnetwork\" target=\"_blank\" rel=\"noreferrer noopener\">LinkedIn<\/a> <a href=\"https:\/\/www.facebook.com\/inspenetnetwork\" target=\"_blank\" rel=\"noreferrer noopener\">Facebook<\/a> <a href=\"https:\/\/www.instagram.com\/inspenet\/\" target=\"_blank\" rel=\"noreferrer noopener\">Instagram<\/a> <a href=\"https:\/\/twitter.com\/Inspenetnetwork\" target=\"_blank\" rel=\"noreferrer noopener\">X<\/a><\/p>\n\n<p><strong>Source<\/strong>: <strong><a href=\"https:\/\/www.argusmedia.com\/pages\/NewsBody.aspx?id=2610545&amp;menu=yes\" target=\"_blank\" rel=\"noreferrer noopener\">Argus Media<\/a><\/strong><\/p>\n\n<p><strong>Photo: Shutterstock<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>According to official spokespersons, the 10 GW capacity planned for 2038 would not justify or guarantee the investment, in the long term, for the financial return of the Norwegian company.<\/p>\n","protected":false},"author":8404,"featured_media":189946,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"_acf_changed":false,"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":""},"categoria_noticias":[13026,13044],"etiqueta_noticias":[],"class_list":["post-189961","noticias","type-noticias","status-publish","has-post-thumbnail","hentry","categoria_noticias-energy","categoria_noticias-new-energies"],"acf":[],"_links":{"self":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/189961","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias"}],"about":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/types\/noticias"}],"author":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/users\/8404"}],"replies":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/comments?post=189961"}],"version-history":[{"count":0,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/189961\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media\/189946"}],"wp:attachment":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media?parent=189961"}],"wp:term":[{"taxonomy":"categoria_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/categoria_noticias?post=189961"},{"taxonomy":"etiqueta_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/etiqueta_noticias?post=189961"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}