{"id":181466,"date":"2024-08-20T16:53:55","date_gmt":"2024-08-20T20:53:55","guid":{"rendered":"https:\/\/inspenet.com\/noticias\/petrobras-submarine-equipment-submarine-field-drone\/"},"modified":"2024-08-20T16:55:42","modified_gmt":"2024-08-20T20:55:42","slug":"petrobras-submarine-equipment-submarine-field-drone","status":"publish","type":"noticias","link":"https:\/\/inspenet.com\/en\/news\/petrobras-submarine-equipment-submarine-field-drone\/","title":{"rendered":"Petrobras signs contract to acquire subsea equipment in the Roncador Field"},"content":{"rendered":"\n<p>On August 16, 2024, Petrobras signed an important contract with SLB OneSubsea for the <strong>acquisition of <a href=\"https:\/\/inspenet.com\/en\/news\/underwater-welder-death-rate\/\" target=\"_blank\" data-type=\"post\" data-id=\"159760\" rel=\"noreferrer noopener\">subsea equipment<\/a> for the Roncador Field<\/strong>, located in the Campos Basin.\nThis agreement will drive the creation of approximately 500 direct and indirect jobs, strengthening the local economy. <\/p>\n\n<h2 class=\"wp-block-heading\">On the acquisition of underwater equipment<\/h2>\n\n<p>The contract includes the supply of two subsea production manifolds (MSP), an electrohydraulic distribution unit (UDEH) and spare equipment.\nIt also includes essential services such as installation, commissioning, maintenance and upkeep of the equipment.\nOne of the highlights is the commitment to a minimum of 40% local content in the demand for goods and services, with the expectation of reaching up to 65%, thus promoting domestic industry.  <\/p>\n\n<p>Manufacturing of the MSP and UDEH will take place at OneSubsea SLB&#8217;s facilities in Taubat\u00e9 (SP) and Curitiba (PR), with <strong>production scheduled to start in the first quarter of 2025.<\/strong>\nOn the other hand, service activities will take place at the Maca\u00e9 (RJ) and Rio das Ostras (RJ) plants. <\/p>\n\n<p>This subsea equipment is essential for offshore oil and gas production.\nSubsea production manifolds concentrate extraction from several wells before directing flow to the Stationary Production Unit (SPU), while electrohydraulic distribution units ensure the supply of fluid needed to connect the subsea umbilicals between the wells and the SPU. <\/p>\n\n<p>The Roncador Field is one of Petrobras&#8217; most important fields, operated in a strategic partnership with <strong><a href=\"https:\/\/inspenet.com\/en\/news\/what-happened-with-equinor-in-surinam\/\" target=\"_blank\" data-type=\"post\" data-id=\"177815\" rel=\"noreferrer noopener\">Equinor<\/a><\/strong>where Petrobras holds a 75% interest.\nThe P-52, P-54, P-55 and P-62 platforms, which include FPSO and semi-submersible units, are installed in deep waters between 1,400 and 1,840 meters, and are key to oil and gas production. <\/p>\n\n<p><strong>Follow us on social networks and don&#8217;t miss any of our publications!<\/strong><\/p>\n\n<p><a href=\"https:\/\/www.youtube.com\/@inspenet\" target=\"_blank\" rel=\"noreferrer noopener\">YouTube<\/a> <a href=\"https:\/\/www.linkedin.com\/company\/inspenetnetwork\" target=\"_blank\" rel=\"noreferrer noopener\">LinkedIn<\/a> <a href=\"https:\/\/www.facebook.com\/inspenetnetwork\" target=\"_blank\" rel=\"noreferrer noopener\">Facebook<\/a> <a href=\"https:\/\/www.instagram.com\/inspenet\/\" target=\"_blank\" rel=\"noreferrer noopener\">Instagram<\/a> <a href=\"https:\/\/twitter.com\/Inspenetnetwork\" target=\"_blank\" rel=\"noreferrer noopener\">X<\/a><\/p>\n\n<p><strong>Source and photo: <a href=\"https:\/\/agencia.petrobras.com.br\/w\/negocio\/contrato-de-aquisicao-de-equipamentos-submarinos-para-o-campo-de-roncador\" target=\"_blank\" rel=\"noreferrer noopener\">Petrobras<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>This equipment is essential for offshore oil and gas production.<\/p>\n","protected":false},"author":8403,"featured_media":181445,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"_acf_changed":false,"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":""},"categoria_noticias":[13026,13036],"etiqueta_noticias":[],"class_list":["post-181466","noticias","type-noticias","status-publish","has-post-thumbnail","hentry","categoria_noticias-energy","categoria_noticias-oil-and-gas"],"acf":[],"_links":{"self":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/181466","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias"}],"about":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/types\/noticias"}],"author":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/users\/8403"}],"replies":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/comments?post=181466"}],"version-history":[{"count":0,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/181466\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media\/181445"}],"wp:attachment":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media?parent=181466"}],"wp:term":[{"taxonomy":"categoria_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/categoria_noticias?post=181466"},{"taxonomy":"etiqueta_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/etiqueta_noticias?post=181466"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}