{"id":178369,"date":"2024-08-09T11:32:06","date_gmt":"2024-08-09T15:32:06","guid":{"rendered":"https:\/\/inspenet.com\/noticias\/e3-lithium-and-lithium-demonstration-plant\/"},"modified":"2024-08-09T14:26:53","modified_gmt":"2024-08-09T18:26:53","slug":"e3-lithium-and-lithium-demonstration-plant","status":"publish","type":"noticias","link":"https:\/\/inspenet.com\/en\/news\/e3-lithium-and-lithium-demonstration-plant\/","title":{"rendered":"E3 Lithium announces construction of lithium demonstration plant in Alberta, Canada"},"content":{"rendered":"\n<p>In a recent press release, E3 Lithium unveiled plans to build <strong>a<\/strong> fully integrated <strong>lithium demonstration plant<\/strong> in Alberta, Canada.\nThis project aims to produce battery grade lithium carbonate from brines located in the Leduc deposit. <\/p>\n\n<h2 class=\"wp-block-heading\">Canadian lithium demonstration plant<\/h2>\n\n<p>This project builds on the results of the successful direct lithium extraction<em>(DLE<\/em>) pilot program conducted in 2023.\nDuring that period, <strong>E3 Lithium evaluated and operated multiple technologies<\/strong>, validating the technical feasibility of its proprietary DLE technology.\nThe data obtained in this program was important to the recently published pre-feasibility study demonstrating the economic viability of lithium projects in Alberta.  <\/p>\n\n<p>The new demonstration plant will operate a fully integrated system that will include DLE technology scale-up, as well as <strong>purification, concentration and chemical conversion processes.<\/strong> These processes will continuously transform the brine into lithium carbonate. <strong><a href=\"https:\/\/inspenet.com\/en\/news\/salar-de-uyuni-of-the-lithium-triangle\/\" target=\"_blank\" rel=\"noreferrer noopener\">brine into battery-grade lithium carbonate.<\/a><\/strong> into battery-grade lithium carbonate.\nIn addition, off-site hydroxide development will be conducted. <\/p>\n\n<p>The facility is projected to be a key economic driver for the <strong><a href=\"https:\/\/inspenet.com\/en\/news\/sodium-ion-battery-production\/\" target=\"_blank\" data-type=\"post\" data-id=\"151782\" rel=\"noreferrer noopener\">battery supply chain<\/a> in Alberta<\/strong>.\nThe company has announced that further details on the design and operation of this demonstration plant will be released in the coming months. <\/p>\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p>&#8220;We are delighted to move forward with the production of battery-grade lithium carbonate from our Leduc brine. Our goal is to become a direct supplier to the battery industry. This demonstration project is vital to the development of the Clearwater project and represents a step towards commercializing our lithium assets in Alberta.&#8221;<\/p>\n<cite>Chris Doornbos, CEO of E3 Lithium.<\/cite><\/blockquote>\n\n<p><strong>Follow us on social networks and don&#8217;t miss any of our publications!<\/strong><\/p>\n\n<p><a href=\"https:\/\/www.youtube.com\/@inspenet\" target=\"_blank\" rel=\"noreferrer noopener\">YouTube<\/a> <a href=\"https:\/\/www.linkedin.com\/company\/inspenetnetwork\" target=\"_blank\" rel=\"noreferrer noopener\">LinkedIn<\/a> <a href=\"https:\/\/www.facebook.com\/inspenetnetwork\" target=\"_blank\" rel=\"noreferrer noopener\">Facebook<\/a> <a href=\"https:\/\/www.instagram.com\/inspenet\/\" target=\"_blank\" rel=\"noreferrer noopener\">Instagram<\/a> <a href=\"https:\/\/twitter.com\/Inspenetnetwork\" target=\"_blank\" rel=\"noreferrer noopener\">X<\/a><\/p>\n\n<p><strong>Source and photo: <a href=\"https:\/\/www.e3lithium.ca\/newsroom\/news-releases\/e3-lithium-plans-to-construct-a-fully-integrated-lithium-demonstration-facility\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">E3 Lithium<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>E3 Lithium plans to be the first in Canada with its fully integrated demonstration facility for high lithium production.<\/p>\n","protected":false},"author":8404,"featured_media":178277,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"_acf_changed":false,"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":""},"categoria_noticias":[13026,13030,13060,13044],"etiqueta_noticias":[],"class_list":["post-178369","noticias","type-noticias","status-publish","has-post-thumbnail","hentry","categoria_noticias-energy","categoria_noticias-industry","categoria_noticias-mining","categoria_noticias-new-energies"],"acf":[],"_links":{"self":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/178369","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias"}],"about":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/types\/noticias"}],"author":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/users\/8404"}],"replies":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/comments?post=178369"}],"version-history":[{"count":0,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/178369\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media\/178277"}],"wp:attachment":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media?parent=178369"}],"wp:term":[{"taxonomy":"categoria_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/categoria_noticias?post=178369"},{"taxonomy":"etiqueta_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/etiqueta_noticias?post=178369"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}