{"id":170891,"date":"2024-07-12T14:19:03","date_gmt":"2024-07-12T18:19:03","guid":{"rendered":"https:\/\/inspenet.com\/noticias\/treatyen-compressor-plant-inaugurated\/"},"modified":"2024-07-12T15:37:01","modified_gmt":"2024-07-12T19:37:01","slug":"treatyen-compressor-plant-inaugurated","status":"publish","type":"noticias","link":"https:\/\/inspenet.com\/en\/news\/treatyen-compressor-plant-inaugurated\/","title":{"rendered":"Inauguration of Tratay\u00e9n&#8217;s compressor plant in Vaca Muerta"},"content":{"rendered":"\n<p>Last Wednesday, July 10, the inauguration of the Tratay\u00e9n Compressor Plant was celebrated, a collaboration between the state-owned Enarsa, the construction company Sacde<em>(Pampa Energ\u00eda<\/em>), and national and Neuqu\u00e9n authorities. This project is strategic for the increase of gas injection capacity from the Vaca Muerta region to the N\u00e9stor Kirchner Gas Pipeline, promising an annual economic benefit of approximately US$350 million.<\/p>\n\n<h2 class=\"wp-block-heading\">The Tratay\u00e9n compressor plant  <\/h2>\n\n<p><strong>Enarsa and Sacde<\/strong> representatives explained that, after reaching mechanical completion at the end of June, the 15,000 HP turbocharger was commissioned. In addition, the installation of an 84-meter &#8220;flare&#8221;, essential for the plant&#8217;s operational safety, has been completed, which allows the controlled burning of residual gas in situations of excess pressure or during maintenance and start-ups.<\/p>\n\n<p>Located in the <strong>core<\/strong> of <strong> <a href=\"https:\/\/inspenet.com\/en\/news\/start-construction-project-vaca-muerta-sur\/\" data-type=\"link\" data-id=\"https:\/\/inspenet.com\/noticias\/inicio-construccion-proyecto-vaca-muerta-sur\/\">Vaca Muerta<\/a><\/strong>, the plant has the capacity to compress and increase the volume of gas transported from 11.2 million to 16 million cubic meters per day. With an investment of US$120 million and the participation of 700 workers, this facility increases the efficiency of gas transportation while enabling the processing of natural gas into high-value by-products.<\/p>\n\n<p>Sacde&#8217;s president and CEO, Dami\u00e1n Mindlin, highlighted the positive impact of the plant, which will add 4.8 million cubic meters of gas per day to the N\u00e9stor Kirchner Pipeline. This increase in capacity contributes to reducing the need to import liquid fuels and LNG, strengthening national energy self-sufficiency.<\/p>\n<div class=\" align\"><div id=\"wpfp_2782\" data-item=\"{&quot;sources&quot;:[{&quot;src&quot;:&quot;https:\\\/\\\/youtu.be\\\/5bq8PNBC2tQ&quot;,&quot;type&quot;:&quot;video\\\/youtube&quot;,&quot;sources_fvqs&quot;:[{&quot;src&quot;:&quot;https:\\\/\\\/youtu.be\\\/5bq8PNBC2tQ&quot;,&quot;type&quot;:&quot;video\\\/youtube&quot;},{&quot;src&quot;:&quot;https:\\\/\\\/youtu.be\\\/5bq8PNBC2tQ&quot;,&quot;type&quot;:&quot;video\\\/youtube&quot;},{&quot;src&quot;:&quot;https:\\\/\\\/youtu.be\\\/5bq8PNBC2tQ&quot;,&quot;type&quot;:&quot;video\\\/youtube&quot;},{&quot;src&quot;:&quot;https:\\\/\\\/youtu.be\\\/5bq8PNBC2tQ&quot;,&quot;type&quot;:&quot;video\\\/youtube&quot;},{&quot;src&quot;:&quot;https:\\\/\\\/youtu.be\\\/5bq8PNBC2tQ&quot;,&quot;type&quot;:&quot;video\\\/youtube&quot;}]}],&quot;id&quot;:&quot;3561&quot;,&quot;splash&quot;:&quot;https:\\\/\\\/i.ytimg.com\\\/vi\\\/5bq8PNBC2tQ\\\/maxresdefault.jpg#auto&quot;}\" class=\"freedomplayer flowplayer no-brand is-splash is-paused skin-custom no-svg fp-full fp-outlined is-youtube is-youtube-standard\" data-fvsticky=\"true\" data-button-repeat=\"1\" data-button-rewind=\"1\" data-fv-embed=\"https:\/\/inspenet.com\/en\/news\/treatyen-compressor-plant-inaugurated\/fvp-2782\/\" style=\"position:relative; max-width: 95%; max-height: 90%; \" data-ratio=\"0.5625\" data-qsel=\"1080p,720p,480p,360p\" data-qlabels=\"1080p,720p,480p,360p\" data-fv_stats_data=\"{&quot;player_id&quot;:&quot;2782&quot;,&quot;post_id&quot;:170891}\" data-engine=\"fvyoutube\" data-speedb=\"1\">\n\t<div class=\"fp-ratio\" style=\"padding-top: 56.25%\"><\/div>\n\t<img decoding=\"async\" style=\"position:absolute;top:0;left:0;width:100%\" class=\"fp-splash\" alt=\"video\" src=\"https:\/\/i.ytimg.com\/vi\/5bq8PNBC2tQ\/maxresdefault.jpg#auto\" \/>\n\t<div class=\"fp-ui\" style=\"position:absolute\"><noscript>Please enable JavaScript<\/noscript><div class=\"fp-play fp-visible\"><svg class=\"fp-play-rounded-outline\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 99.844 99.8434\"><defs><style>.fp-color-play{opacity:0.65;}.controlbutton{fill:#fff;}<\/style><\/defs><title>play-rounded-outline<\/title><path class=\"fp-color-play\" d=\"M49.9217-.078a50,50,0,1,0,50,50A50.0564,50.0564,0,0,0,49.9217-.078Z\"\/><path class=\"controlbutton\" d=\"M41.0359,71.19a5.0492,5.0492,0,0,1-2.5575-.6673c-1.8031-1.041-2.7958-3.1248-2.7958-5.8664V35.1887c0-2.7429.9933-4.8272,2.797-5.8676,1.8025-1.0422,4.1034-.86,6.48.5143L70.4782,44.5672c2.3751,1.3711,3.6826,3.2725,3.6832,5.3545s-1.3076,3.9845-3.6832,5.3562L44.9592,70.0114A7.9384,7.9384,0,0,1,41.0359,71.19Zm.0065-40.123a2.6794,2.6794,0,0,0-1.3582.3413c-1.0263.5926-1.5912,1.9349-1.5912,3.78V64.6563c0,1.8449.5649,3.1866,1.5906,3.7791,1.0281.5932,2.4733.4108,4.07-.512L69.273,53.1906c1.5983-.9227,2.478-2.0838,2.478-3.2689s-.88-2.3445-2.478-3.2666L43.754,31.9227A5.5685,5.5685,0,0,0,41.0423,31.0671Z\" filter=\"url(#f1)\"\/><\/svg><\/div><div class=\"fp-preload\"><b><\/b><b><\/b><b><\/b><b><\/b><\/div><\/div>\n<div class='fvp-share-bar'><div><label><a class=\"embed-code-toggle\" href=\"#\"><strong>Embed<\/strong><\/a><\/label><\/div><div class=\"embed-code\"><label>Copy and paste this HTML code into your webpage to embed.<\/label><textarea><\/textarea><\/div><\/div>\n<\/div>\n<\/div>\n<p><\/p>\n\n<p class=\"has-text-align-center\">The installation of the Tratay\u00e9n compressor plant. Source: Sacde<\/p>\n\n<p>The activation of the Tratay\u00e9n plant marks the beginning of the first phase of the project to double the amount of gas in the Tratay\u00e9n pipeline.<strong> <a href=\"https:\/\/www.energia-argentina.com.ar\/index.php\/estado-de-situacion-de-las-plantas-compresoras-de-tratayen-salliquelo-y-mercedes\/\" data-type=\"link\" data-id=\"https:\/\/www.energia-argentina.com.ar\/index.php\/estado-de-situacion-de-las-plantas-compresoras-de-tratayen-salliquelo-y-mercedes\/\" target=\"_blank\" rel=\"noreferrer noopener\">gas in the Gas Pipeline<\/a><\/strong>. The next stage includes the completion of the Salliquel\u00f3 plant and, subsequently, the Mercedes plant, which is expected to be operational by the end of September, increasing capacity to 21 million cubic meters per day.<\/p>\n\n<p><strong>Follow us on social networks and don&#8217;t miss any of our publications!<\/strong><\/p>\n\n<p><a href=\"https:\/\/www.youtube.com\/@inspenet\" target=\"_blank\" rel=\"noreferrer noopener\">YouTube<\/a> <a href=\"https:\/\/www.linkedin.com\/company\/inspenetnetwork\" target=\"_blank\" rel=\"noreferrer noopener\">LinkedIn<\/a> <a href=\"https:\/\/www.facebook.com\/inspenetnetwork\" target=\"_blank\" rel=\"noreferrer noopener\">Facebook<\/a> <a href=\"https:\/\/www.instagram.com\/inspenet\/\" target=\"_blank\" rel=\"noreferrer noopener\">Instagram<\/a> <a href=\"https:\/\/twitter.com\/Inspenetnetwork\" target=\"_blank\" rel=\"noreferrer noopener\">X<\/a><\/p>\n\n<p><strong>Source and photo:<\/strong> <strong>\n  <a href=\"https:\/\/www.energia-argentina.com.ar\/index.php\/se-puso-en-marcha-la-planta-compresora-tratayen-del-gpnk\/\" data-type=\"link\" data-id=\"https:\/\/www.energia-argentina.com.ar\/index.php\/se-puso-en-marcha-la-planta-compresora-tratayen-del-gpnk\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">Enarsa<\/a>\n<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Enarsa and Sacde detailed that after reaching mechanical completion in June, start-up of the plant&#8217;s 15,000 HP turbocharger began.<\/p>\n","protected":false},"author":8404,"featured_media":170846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"_acf_changed":false,"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":""},"categoria_noticias":[13026,13036],"etiqueta_noticias":[],"class_list":["post-170891","noticias","type-noticias","status-publish","has-post-thumbnail","hentry","categoria_noticias-energy","categoria_noticias-oil-and-gas"],"acf":[],"_links":{"self":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/170891","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias"}],"about":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/types\/noticias"}],"author":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/users\/8404"}],"replies":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/comments?post=170891"}],"version-history":[{"count":0,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/170891\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media\/170846"}],"wp:attachment":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media?parent=170891"}],"wp:term":[{"taxonomy":"categoria_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/categoria_noticias?post=170891"},{"taxonomy":"etiqueta_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/etiqueta_noticias?post=170891"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}