{"id":170014,"date":"2024-07-10T10:51:24","date_gmt":"2024-07-10T14:51:24","guid":{"rendered":"https:\/\/inspenet.com\/noticias\/prysmian-test-submarine-hvdc-cable\/"},"modified":"2024-07-10T14:26:42","modified_gmt":"2024-07-10T18:26:42","slug":"prysmian-test-submarine-hvdc-cable","status":"publish","type":"noticias","link":"https:\/\/inspenet.com\/en\/news\/prysmian-test-submarine-hvdc-cable\/","title":{"rendered":"Prysmian completes sea trials for 500 kV ultra-deepwater HVDC subsea cable"},"content":{"rendered":"\n<p>Prysmian has announced the successful completion of sea trials for the installation of a 500 kV HVDC MI1 HVDC cable at a depth of 2150 meters. This project is the first HVDC cable laying at such a depth, setting new standards in the market.<\/p>\n\n<h2 class=\"wp-block-heading\">HVDC submarine cable installation tests<\/h2>\n\n<p>The cable is made of a high modulus synthetic fiber composite material, representing the next generation in cable technology. The innovative shielding solution, which is 50% lighter than steel underwater, together with the advanced Leonardo da Vinci cable-laying vessel, will facilitate the installation and maintenance of Terna&#8217;s Tyrrhenian Link at depths in excess of 2000 meters, a record in the history of power cables.<\/p>\n\n<p>The success of these sea trials is the result of numerous laboratory tests, reaffirming Prysmian&#8217;s innovations. This light armor technology was used in 2019 for the Euboea-Andros-Tinos interconnection at 550 meters depth and in 2020 for the Crete-Peloponnese subsea project at 1000 meters.<\/p>\n\n<p>The cable will be essential for the Tyrrhenian Link, a project valued at \u20ac1.7 billion awarded in 2021 by Terna SpA. Under the contract, Prysmian will design, supply and install more than 1,500 km of <strong>\n  <a href=\"https:\/\/inspenet.com\/en\/news\/deploy-cable-protection-system\/\" target=\"_blank\" data-type=\"post\" data-id=\"147727\" rel=\"noreferrer noopener\">submarine cables<\/a>\n<\/strong>supporting the energy exchange between Sardinia, Sicily and Campania, thus consolidating the energy hub of the Mediterranean.<\/p>\n\n<p><strong>Follow us on social networks and don&#8217;t miss any of our publications!<\/strong><\/p>\n\n<p><a href=\"https:\/\/www.youtube.com\/@inspenet\" target=\"_blank\" rel=\"noreferrer noopener\">YouTube<\/a> <a href=\"https:\/\/www.linkedin.com\/company\/inspenetnetwork\" target=\"_blank\" rel=\"noreferrer noopener\">LinkedIn<\/a> <a href=\"https:\/\/www.facebook.com\/inspenetnetwork\" target=\"_blank\" rel=\"noreferrer noopener\">Facebook<\/a> <a href=\"https:\/\/www.instagram.com\/inspenet\/\" target=\"_blank\" rel=\"noreferrer noopener\">Instagram<\/a> <a href=\"https:\/\/twitter.com\/Inspenetnetwork\" target=\"_blank\" rel=\"noreferrer noopener\">X<\/a><\/p>\n\n<p><strong>Source and photo:<\/strong> <strong>\n  <a href=\"https:\/\/www.prysmian.com\/en\/media\/press-releases\/record-breaking-submarine-cable-installation-at-2-150-m-water-depth\" data-type=\"link\" data-id=\"https:\/\/www.prysmian.com\/en\/media\/press-releases\/record-breaking-submarine-cable-installation-at-2-150-m-water-depth\" target=\"_blank\" rel=\"noreferrer noopener\">Prysmian<\/a>\n<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The submarine cable is made of a high modulus synthetic fiber composite material, a superior performance technology.<\/p>\n","protected":false},"author":8404,"featured_media":170117,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"_acf_changed":false,"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":""},"categoria_noticias":[13026,13048],"etiqueta_noticias":[],"class_list":["post-170014","noticias","type-noticias","status-publish","has-post-thumbnail","hentry","categoria_noticias-energy","categoria_noticias-maritime"],"acf":[],"_links":{"self":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/170014","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias"}],"about":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/types\/noticias"}],"author":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/users\/8404"}],"replies":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/comments?post=170014"}],"version-history":[{"count":0,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/170014\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media\/170117"}],"wp:attachment":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media?parent=170014"}],"wp:term":[{"taxonomy":"categoria_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/categoria_noticias?post=170014"},{"taxonomy":"etiqueta_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/etiqueta_noticias?post=170014"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}