{"id":168506,"date":"2024-07-02T15:30:51","date_gmt":"2024-07-02T20:00:51","guid":{"rendered":"https:\/\/inspenet.com\/noticias\/dnv-iberdrola-marine-eolian-park\/"},"modified":"2024-07-02T16:27:48","modified_gmt":"2024-07-02T20:57:48","slug":"dnv-iberdrola-marine-eolian-park","status":"publish","type":"noticias","link":"https:\/\/inspenet.com\/en\/news\/dnv-iberdrola-marine-eolian-park\/","title":{"rendered":"DNV to verify the power output of Iberdrola&#8217;s offshore wind farm"},"content":{"rendered":"\n<p>DNV has been selected to carry out the <strong>verification of the power curve at <a href=\"https:\/\/inspenet.com\/en\/news\/third-eolian-marine-park-in-germany\/\" data-type=\"post\" data-id=\"167197\" target=\"_blank\" rel=\"noreferrer noopener\">Iberdrola&#8217;s offshore wind farm<\/a><\/strong>.<a href=\"https:\/\/inspenet.com\/en\/news\/third-eolian-marine-park-in-germany\/\" data-type=\"post\" data-id=\"167197\" target=\"_blank\" rel=\"noreferrer noopener\"> <\/a>in the Bay of St. Thomas. Brieuc, France, using advanced gondola lidar technology.<\/p>\n\n<p>Located 16 km from Cape Fr\u00e9hel, in the bay of Saint-Brieuc, in the department of C\u00f4tes-d&#8217;Armor, this park stands out as the <strong>first large-scale offshore wind farm in Brittany<\/strong> and the second in all of France dedicated to the production of renewable energy.<\/p>\n\n<p>Developed by Ailes Marines, a subsidiary of Iberdrola, the 62-turbine wind farm began operating in May 2024. With a total installed capacity of 496 MW, it is anticipated that the wind farm will significantly increase the supply of clean energy. <strong>\n  <a href=\"https:\/\/inspenet.com\/en\/news\/photovoltaic-plant-generating-clean-energy\/\" target=\"_blank\" data-type=\"post\" data-id=\"157354\" rel=\"noreferrer noopener\">clean energy<\/a>\n<\/strong> in the region, providing enough green electricity for approximately 835,000 households, representing 9% of the region&#8217;s total consumption.<\/p>\n\n<h2 class=\"wp-block-heading\">Keys to efficiency at Iberdrola&#8217;s offshore wind farm<\/h2>\n\n<p><strong>\n  <a href=\"https:\/\/www.dnv.com\/news\/dnv-selected-for-power-curve-verification-at-bay-of-st.-brieuc-offshore-wind-farm-using-advanced-nacelle-lidar-technology\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/www.dnv.com\/news\/dnv-selected-for-power-curve-verification-at-bay-of-st.-brieuc-offshore-wind-farm-using-advanced-nacelle-lidar-technology\" rel=\"noreferrer noopener\">DNV&#8217;s power curve verification project includes the design, commissioning and implementation of a power performance measurement (PPM) campaign for three turbines.<\/a>\n<\/strong>commissioning and implementation of a power performance measurement (PPM) campaign for three turbines, as well as the installation of all the necessary equipment to ensure that the campaign meets accreditation standards.<\/p>\n\n<p>Prior to implementation, the lidars will be calibrated at DNV&#8217;s testing facility in Germany to comply with the updated IEC 61400-50-3:2022 standard. This standard allows the use of nacelle mounted lidars (NML) in performance evaluations, an area in which DNV has vast experience.<\/p>\n\n<p>The verification of the power curve will allow Iberdrola to align the actual energy production with the initial projections, improving the accuracy of the wind farm economic models. <strong>\n  <a href=\"https:\/\/inspenet.com\/en\/news\/vineyard-wind-1-marine-wind-farm-in-usa\/\" target=\"_blank\" data-type=\"post\" data-id=\"168080\" rel=\"noreferrer noopener\">wind farm<\/a>\n<\/strong>. This initiative not only optimizes operational efficiency, but also supports the company&#8217;s sustainable development objectives.<\/p>\n\n<h2 class=\"wp-block-heading\">LIDAR and DNV technology<\/h2>\n\n<p><em>&#8220;After full commissioning of the Saint Brieuc offshore wind farm, Iberdrola\/Ailes Marines looks forward to monitoring wind conditions and asset performance with nacelle LIDAR technology<\/em>,&#8221; commented J\u00e9r\u00f4me Dumont, offshore wind resources manager at Iberdrola. &#8220;<em>We are confident that the experience and expertise of DNV, a key player in power curve testing, will ensure a successful and informative measurement campaign, based on up-to-date standards and technology<\/em>.&#8221;<\/p>\n\n<p><strong>Follow us on social networks and don&#8217;t miss any of our publications!<\/strong><\/p>\n\n<p><a href=\"https:\/\/www.youtube.com\/@inspenet\" target=\"_blank\" rel=\"noreferrer noopener\">YouTube<\/a> <a href=\"https:\/\/www.linkedin.com\/company\/inspenetnetwork\" target=\"_blank\" rel=\"noreferrer noopener\">LinkedIn<\/a> <a href=\"https:\/\/www.facebook.com\/inspenetnetwork\" target=\"_blank\" rel=\"noreferrer noopener\">Facebook<\/a> <a href=\"https:\/\/www.instagram.com\/inspenet\/\" target=\"_blank\" rel=\"noreferrer noopener\">Instagram<\/a> <a href=\"https:\/\/twitter.com\/Inspenetnetwork\" target=\"_blank\" rel=\"noreferrer noopener\">X<\/a><\/p>\n\n<p><strong>Source: <a href=\"https:\/\/www.oedigital.com\/news\/514914-dnv-to-verify-power-production-of-iberdrola-s-496mw-offshore-wind-farm\" target=\"_blank\" rel=\"noreferrer noopener\">oedigital<\/a><\/strong><\/p>\n\n<p><strong>Photo: Shutterstock<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Saint Brieuc offshore wind farm is the first large-scale installation of its kind in Brittany and the second in France.<\/p>\n","protected":false},"author":9014,"featured_media":168355,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"_acf_changed":false,"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":""},"categoria_noticias":[13026,13044],"etiqueta_noticias":[],"class_list":["post-168506","noticias","type-noticias","status-publish","has-post-thumbnail","hentry","categoria_noticias-energy","categoria_noticias-new-energies"],"acf":[],"_links":{"self":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/168506","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias"}],"about":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/types\/noticias"}],"author":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/users\/9014"}],"replies":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/comments?post=168506"}],"version-history":[{"count":0,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/168506\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media\/168355"}],"wp:attachment":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media?parent=168506"}],"wp:term":[{"taxonomy":"categoria_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/categoria_noticias?post=168506"},{"taxonomy":"etiqueta_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/etiqueta_noticias?post=168506"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}