{"id":167859,"date":"2024-06-30T15:17:00","date_gmt":"2024-06-30T19:47:00","guid":{"rendered":"https:\/\/inspenet.com\/noticias\/turbine-from-central-thermal-power-plant-modesto-maranzana\/"},"modified":"2024-06-30T17:18:19","modified_gmt":"2024-06-30T21:48:19","slug":"turbine-from-central-thermal-power-plant-modesto-maranzana","status":"publish","type":"noticias","link":"https:\/\/inspenet.com\/en\/news\/turbine-from-central-thermal-power-plant-modesto-maranzana\/","title":{"rendered":"Argentina: Eighth gas turbine for the Modesto Maranzana Thermal Power Plant commissioned"},"content":{"rendered":"\n<p>Compa\u00f1\u00eda Administradora del Mercado Mayorista El\u00e9ctrico S.A. (Cammesa) has authorized the start-up of the eighth gas turbine at the Modesto Maranzana Thermal Power Plant, operated by Grupo Albanesi, in R\u00edo Cuarto, C\u00f3rdoba.<\/p>\n\n<p>This energy expansion project has required an <strong>investment of US$190 million<\/strong>, being part of the effort to convert the open-cycle thermal power plant to combined cycle. <strong>\n  <a href=\"https:\/\/inspenet.com\/en\/articulo\/technological-advances-in-asset-management-in-the-new-energy-sector\/\" target=\"_blank\" data-type=\"articulo\" data-id=\"81688\" rel=\"noreferrer noopener\">to a combined cycle thermal generation plant.<\/a>\n<\/strong>. This power plant is Albanesi&#8217;s largest installation in Argentina.<\/p>\n\n<h2 class=\"wp-block-heading\">Modesto Maranzana Thermal Power Plant: project stages<\/h2>\n\n<p>The second phase of the project, scheduled to be inaugurated in the last quarter of the year, includes the activation of a <strong>new steam turbine that will add 125 MW to the plant&#8217;s installed capacity<\/strong>. With this addition, the plant will reach a total capacity of 475 MW, consolidating its position as a key pillar for electricity supply in C\u00f3rdoba, currently supplying 25% of the energy consumed in the province.<\/p>\n\n<p>This development is part of an ambitious investment plan that exceeds US$500 million, noted Albanesi Group, the leading marketer of <strong>\n  <a href=\"https:\/\/inspenet.com\/en\/news\/a-new-renewable-natural-gas-station\/\" data-type=\"post\" data-id=\"166743\" target=\"_blank\" rel=\"noreferrer noopener\">natural gas<\/a>\n<\/strong> natural gas marketer in Argentina. Among the most relevant initiatives, it is worth mentioning the completion of the expansion and closing of the combined cycle of the Ezeiza Thermal Power Plant, which has doubled its installed capacity from 150 MW to 300 MW since April, with an investment of more than 220 million dollars.<\/p>\n<div class=\" align\"><div id=\"wpfp_2710\" data-item=\"{&quot;sources&quot;:[{&quot;src&quot;:&quot;https:\\\/\\\/www.youtube.com\\\/watch?v=OAB_TBrYjZk\\u0026ab_channel=GrupoAlbanesi&quot;,&quot;type&quot;:&quot;video\\\/youtube&quot;,&quot;sources_fvqs&quot;:[{&quot;src&quot;:&quot;https:\\\/\\\/www.youtube.com\\\/watch?v=OAB_TBrYjZk\\u0026ab_channel=GrupoAlbanesi&quot;,&quot;type&quot;:&quot;video\\\/youtube&quot;},{&quot;src&quot;:&quot;https:\\\/\\\/www.youtube.com\\\/watch&quot;,&quot;type&quot;:&quot;video\\\/youtube&quot;},{&quot;src&quot;:&quot;https:\\\/\\\/www.youtube.com\\\/watch&quot;,&quot;type&quot;:&quot;video\\\/youtube&quot;},{&quot;src&quot;:&quot;https:\\\/\\\/www.youtube.com\\\/watch&quot;,&quot;type&quot;:&quot;video\\\/youtube&quot;},{&quot;src&quot;:&quot;https:\\\/\\\/www.youtube.com\\\/watch&quot;,&quot;type&quot;:&quot;video\\\/youtube&quot;}]}],&quot;id&quot;:&quot;3489&quot;,&quot;splash&quot;:&quot;https:\\\/\\\/i.ytimg.com\\\/vi\\\/OAB_TBrYjZk\\\/maxresdefault.jpg#auto&quot;}\" class=\"freedomplayer flowplayer no-brand is-splash is-paused skin-custom no-svg fp-full fp-outlined is-youtube is-youtube-standard\" data-fvsticky=\"true\" data-button-repeat=\"1\" data-button-rewind=\"1\" data-fv-embed=\"https:\/\/inspenet.com\/en\/news\/turbine-from-central-thermal-power-plant-modesto-maranzana\/fvp-2710\/\" style=\"position:relative; max-width: 95%; max-height: 90%; \" data-ratio=\"0.5625\" data-qsel=\"1080p,720p,480p,360p\" data-qlabels=\"1080p,720p,480p,360p\" data-fv_stats_data=\"{&quot;player_id&quot;:&quot;2710&quot;,&quot;post_id&quot;:167859}\" data-engine=\"fvyoutube\" data-speedb=\"1\">\n\t<div class=\"fp-ratio\" style=\"padding-top: 56.25%\"><\/div>\n\t<img decoding=\"async\" style=\"position:absolute;top:0;left:0;width:100%\" class=\"fp-splash\" alt=\"video\" src=\"https:\/\/i.ytimg.com\/vi\/OAB_TBrYjZk\/maxresdefault.jpg#auto\" \/>\n\t<div class=\"fp-ui\" style=\"position:absolute\"><noscript>Please enable JavaScript<\/noscript><div class=\"fp-play fp-visible\"><svg class=\"fp-play-rounded-outline\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 99.844 99.8434\"><defs><style>.fp-color-play{opacity:0.65;}.controlbutton{fill:#fff;}<\/style><\/defs><title>play-rounded-outline<\/title><path class=\"fp-color-play\" d=\"M49.9217-.078a50,50,0,1,0,50,50A50.0564,50.0564,0,0,0,49.9217-.078Z\"\/><path class=\"controlbutton\" d=\"M41.0359,71.19a5.0492,5.0492,0,0,1-2.5575-.6673c-1.8031-1.041-2.7958-3.1248-2.7958-5.8664V35.1887c0-2.7429.9933-4.8272,2.797-5.8676,1.8025-1.0422,4.1034-.86,6.48.5143L70.4782,44.5672c2.3751,1.3711,3.6826,3.2725,3.6832,5.3545s-1.3076,3.9845-3.6832,5.3562L44.9592,70.0114A7.9384,7.9384,0,0,1,41.0359,71.19Zm.0065-40.123a2.6794,2.6794,0,0,0-1.3582.3413c-1.0263.5926-1.5912,1.9349-1.5912,3.78V64.6563c0,1.8449.5649,3.1866,1.5906,3.7791,1.0281.5932,2.4733.4108,4.07-.512L69.273,53.1906c1.5983-.9227,2.478-2.0838,2.478-3.2689s-.88-2.3445-2.478-3.2666L43.754,31.9227A5.5685,5.5685,0,0,0,41.0423,31.0671Z\" filter=\"url(#f1)\"\/><\/svg><\/div><div class=\"fp-preload\"><b><\/b><b><\/b><b><\/b><b><\/b><\/div><\/div>\n<div class='fvp-share-bar'><div><label><a class=\"embed-code-toggle\" href=\"#\"><strong>Embed<\/strong><\/a><\/label><\/div><div class=\"embed-code\"><label>Copy and paste this HTML code into your webpage to embed.<\/label><textarea><\/textarea><\/div><\/div>\n<\/div>\n<\/div>\n<p><\/p>\n\n<p class=\"has-text-align-center\">Progress of the Modesto Maranzana Thermal Power Plant. Source: Albanesi Group.<\/p>\n\n<p>Another significant investment is the construction of the<strong> <a href=\"https:\/\/www.albanesi.com.ar\/en_central_termica_arroyo_seco.php\" target=\"_blank\" rel=\"noreferrer noopener\">Arroyo Seco Cogeneration Plant in Santa Fe.<\/a><\/strong>. This project, with an investment of more than US$150 million, will have an installed capacity of 130 MW that will be connected to the Argentine Interconnection System (SADI) and will produce 180 tons per hour of process steam for the industry. This steam will be supplied to the Louis Dreyfus Company&#8217;s industrial complex for its production process.<\/p>\n\n<p>The first stage is expected to be operational in the third quarter of this year and the second stage in the first quarter of 2025.<\/p>\n\n<p>By the end of the year, Albanesi, with 95 years of experience in the electricity generation market <strong>\n  <a href=\"https:\/\/inspenet.com\/en\/news\/the-dominican-republic-will-install-2000-megawatts-of-energy-to-renew-the-power-generation-park\/\" target=\"_blank\" data-type=\"post\" data-id=\"38226\" rel=\"noreferrer noopener\">power generation and natural gas supply<\/a>\n<\/strong> and natural gas supply, will approach 2,000 MW of installed capacity through its 10 plants equipped with state-of-the-art technology, including the Cogeneration Plant in Talara, northern Peru.<\/p>\n\n<p><strong>Follow us on social networks and don&#8217;t miss any of our publications!<\/strong><\/p>\n\n<p><a href=\"https:\/\/www.youtube.com\/@inspenet\" target=\"_blank\" rel=\"noreferrer noopener\">YouTube<\/a> <a href=\"https:\/\/www.linkedin.com\/company\/inspenetnetwork\" target=\"_blank\" rel=\"noreferrer noopener\">LinkedIn<\/a> <a href=\"https:\/\/www.facebook.com\/inspenetnetwork\" target=\"_blank\" rel=\"noreferrer noopener\">Facebook<\/a> <a href=\"https:\/\/www.instagram.com\/inspenet\/\" target=\"_blank\" rel=\"noreferrer noopener\">Instagram<\/a> <a href=\"https:\/\/twitter.com\/Inspenetnetwork\" target=\"_blank\" rel=\"noreferrer noopener\">X<\/a><\/p>\n\n<p><strong>Source: <a href=\"https:\/\/gemedi-my.sharepoint.com\/personal\/ffagioli_albanesi_com_ar\/_layouts\/15\/onedrive.aspx?id=%2Fpersonal%2Fffagioli%5Falbanesi%5Fcom%5Far%2FDocuments%2FEscritorio%2FCOMUNICADOS%20PARA%20LA%20WEB%2F20240626%20COMUNICADO%20MARANZANA%20TG8%2Epdf&amp;parent=%2Fpersonal%2Fffagioli%5Falbanesi%5Fcom%5Far%2FDocuments%2FEscritorio%2FCOMUNICADOS%20PARA%20LA%20WEB&amp;ga=1\" target=\"_blank\" rel=\"noreferrer noopener\">Albanesi Group<\/a><\/strong><\/p>\n\n<p><strong>Photo: Shutterstock<\/strong> <\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Maranzana power plant now supplies 25% of the energy consumed in C\u00f3rdoba, consolidating its position as an essential pillar of the provincial power supply.<\/p>\n","protected":false},"author":8403,"featured_media":167849,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"_acf_changed":false,"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":""},"categoria_noticias":[13026,13044],"etiqueta_noticias":[],"class_list":["post-167859","noticias","type-noticias","status-publish","has-post-thumbnail","hentry","categoria_noticias-energy","categoria_noticias-new-energies"],"acf":[],"_links":{"self":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/167859","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias"}],"about":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/types\/noticias"}],"author":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/users\/8403"}],"replies":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/comments?post=167859"}],"version-history":[{"count":0,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/167859\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media\/167849"}],"wp:attachment":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media?parent=167859"}],"wp:term":[{"taxonomy":"categoria_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/categoria_noticias?post=167859"},{"taxonomy":"etiqueta_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/etiqueta_noticias?post=167859"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}