{"id":164658,"date":"2024-06-14T16:20:05","date_gmt":"2024-06-14T20:50:05","guid":{"rendered":"https:\/\/inspenet.com\/noticias\/endesa-and-the-second-solar-park-in-andorra\/"},"modified":"2024-06-14T16:24:10","modified_gmt":"2024-06-14T20:54:10","slug":"endesa-and-the-second-solar-park-in-andorra","status":"publish","type":"noticias","link":"https:\/\/inspenet.com\/en\/news\/endesa-and-the-second-solar-park-in-andorra\/","title":{"rendered":"Endesa Breaks Ground on Andorra\u2019s Second Solar Farm"},"content":{"rendered":"\n<p>Endesa, through its renewable energy subsidiary Enel Green Power Espa\u00f1a (EGPE), <strong>has begun construction of its second solar farm in Andorra<\/strong>. This new project, called the Mud\u00e9jar photovoltaic plant, will have a capacity of 69.2 MWp and an investment of 48.5 million euros.<\/p>\n\n<h2 class=\"wp-block-heading\">Endesa&#8217;s project and its second solar park in Andorra<\/h2>\n\n<p>The Mud\u00e9jar photovoltaic plant <strong>will officially be Endesa&#8217;s second solar installation, <\/strong>within the perimeter of the Andorra thermal power plant, following the service model of the 49.71 MWp Sed\u00e9is V solar park last December. In addition, Endesa collaborates with local associations, <strong>\n  <a href=\"https:\/\/inspenet.com\/en\/news\/endesa-ia-digital-twins-hydroelectric\/\" data-type=\"post\" data-id=\"123752\" target=\"_blank\" rel=\"noreferrer noopener\">Endesa collaborates with local associations<\/a>\n<\/strong> to support the construction of these facilities.<\/p>\n\n<p>The <strong>Mud\u00e9jar project <\/strong>will be developed in the former coal park of the Andorra thermal power plant and on the land of the closed<em>&#8220;Mas de Perl\u00e9<\/em>&#8221; landfill. This project will cover an area of 111.4 hectares, and the installation will consist of 126,504 photovoltaic modules of crystalline technology and fixed structure, capable of generating more than 128 GWh per year.<\/p>\n\n<p>This production is enough to supply 32,000 households and will prevent the emission of approximately 52,196 tons of CO\u2082 per year. The<strong> plant<\/strong> is scheduled to be connected<strong> to the power<\/strong> grid by the end of 2024, according to official company reports.<\/p>\n\n<p>The<strong> subsidiary Enel Green Power Spain <\/strong>will use innovative tools and techniques, such as drones for surveying, intelligent tracking, advanced digital platforms and software solutions to remotely monitor and support activities. These technologies will enable faster, more accurate and reliable data collection, improving construction quality and facilitating communication between teams on and off site.<\/p>\n\n<p><strong>Follow us on social networks and don&#8217;t miss any of our publications!<\/strong><\/p>\n\n<p><a href=\"https:\/\/www.youtube.com\/@inspenet\" target=\"_blank\" rel=\"noreferrer noopener\">YouTube<\/a> <a href=\"https:\/\/www.linkedin.com\/company\/inspenetnetwork\" target=\"_blank\" rel=\"noreferrer noopener\">LinkedIn<\/a> <a href=\"https:\/\/www.facebook.com\/inspenetnetwork\" target=\"_blank\" rel=\"noreferrer noopener\">Facebook<\/a> <a href=\"https:\/\/www.instagram.com\/inspenet\/\" target=\"_blank\" rel=\"noreferrer noopener\">Instagram<\/a> <a href=\"https:\/\/twitter.com\/Inspenetnetwork\" target=\"_blank\" rel=\"noreferrer noopener\">X<\/a><\/p>\n\n<p><strong>Source and photo<\/strong>: <strong>\n  <a href=\"https:\/\/www.endesa.com\/es\/prensa\/sala-de-prensa\/noticias\/transicion-energetica\/renovables\/construccion-parque-solar-perimetro-central-termica-andorra#scrollTo\" data-type=\"link\" data-id=\"https:\/\/www.endesa.com\/es\/prensa\/sala-de-prensa\/noticias\/transicion-energetica\/renovables\/construccion-parque-solar-perimetro-central-termica-andorra#scrollTo\" target=\"_blank\" rel=\"noreferrer noopener\">Endesa<\/a>\n<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Mud\u00e9jar project will be developed in the former coal park of the Andorra thermal power plant.<\/p>\n","protected":false},"author":8404,"featured_media":164635,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"_acf_changed":false,"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":""},"categoria_noticias":[13026,13044],"etiqueta_noticias":[],"class_list":["post-164658","noticias","type-noticias","status-publish","has-post-thumbnail","hentry","categoria_noticias-energy","categoria_noticias-new-energies"],"acf":[],"_links":{"self":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/164658","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias"}],"about":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/types\/noticias"}],"author":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/users\/8404"}],"replies":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/comments?post=164658"}],"version-history":[{"count":0,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/164658\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media\/164635"}],"wp:attachment":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media?parent=164658"}],"wp:term":[{"taxonomy":"categoria_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/categoria_noticias?post=164658"},{"taxonomy":"etiqueta_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/etiqueta_noticias?post=164658"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}