{"id":164042,"date":"2024-06-13T14:16:22","date_gmt":"2024-06-13T18:46:22","guid":{"rendered":"https:\/\/inspenet.com\/noticias\/nuclear-nuclear-power-plant-of-culmin-culmin-load\/"},"modified":"2024-06-14T14:04:09","modified_gmt":"2024-06-14T18:34:09","slug":"nuclear-nuclear-power-plant-of-culmin-culmin-load","status":"publish","type":"noticias","link":"https:\/\/inspenet.com\/en\/news\/nuclear-nuclear-power-plant-of-culmin-culmin-load\/","title":{"rendered":"Trillo nuclear power plant completes refueling cycle without incident"},"content":{"rendered":"\n<p>The <strong>Trillo nuclear power plant<\/strong>, located in Spain, has started a new operating cycle after successfully completing its 36th refueling. This process involved the participation of an additional 1,000 workers from approximately 40 specialized collaborating companies.<\/p>\n\n<h2 class=\"wp-block-heading\">The Trillo nuclear power plant<\/h2>\n\n<p>The recharge program was completed four days ahead of the original schedule. This is the third consecutive refueling to be carried out &#8220;without accidents and maintaining radiation doses&#8221; below the targets established for this period, Spain&#8217;s nuclear power plant said in a press release.<\/p>\n\n<p>In addition, several essential activities were carried out for the correct operation of the plant. These include the<strong>renewal of planned fuel assemblies<\/strong>, the <strong>execution of tests required<\/strong>by operational specifications and the overhaul of<strong> installations, equipment and <\/strong>critical<strong> components <\/strong>.<\/p>\n\n<p>During planning, a total of 12,300 work orders were executed. From the overhaul of the high pressure turbine to the cleaning and overhaul of an essential cooling pool. In addition, 22 design modifications were implemented to update and improve the facilities, adapting them to new industrial and technological requirements to ensure plant reliability and safety.<\/p>\n\n<h2 class=\"wp-block-heading\">Spain&#8217;s annual electricity demand<\/h2>\n\n<p>The <strong>\n  <a href=\"https:\/\/www.foronuclear.org\/descubre-la-energia-nuclear\/energia-nuclear-en-espana\/central-nuclear-de-trillo\/\" data-type=\"link\" data-id=\"https:\/\/www.foronuclear.org\/descubre-la-energia-nuclear\/energia-nuclear-en-espana\/central-nuclear-de-trillo\/\" target=\"_blank\" rel=\"noreferrer noopener\">Trillo nuclear power plant<\/a>\n<\/strong> contributes 3% of the country&#8217;s annualized electricity demand. In 2023, the plant produced 8,295 gigawatt-hours (GWh) of gross electric power, which contributed to avoiding the emission of more than 2.5 million tons of CO\u2082 into the atmosphere.<\/p>\n\n<p>The plant&#8217;s press release stressed that its excellent performance indicators reflect the reliability and stability of its operation. After the absence of CO\u2082 emissions, nuclear energy <strong>\n  <a href=\"https:\/\/inspenet.com\/en\/articulo\/nuclear-energy-principles-overview\/\" target=\"_blank\" data-type=\"articulo\" data-id=\"157977\" rel=\"noreferrer noopener\">nuclear power<\/a>\n<\/strong> continues to be a vital technology that generates more than 20% of national electricity.<\/p>\n\n<p><strong>Follow us on social networks and don&#8217;t miss any of our publications!<\/strong><\/p>\n\n<p><a href=\"https:\/\/www.youtube.com\/@inspenet\" target=\"_blank\" rel=\"noreferrer noopener\">YouTube<\/a> <a href=\"https:\/\/www.linkedin.com\/company\/inspenetnetwork\" target=\"_blank\" rel=\"noreferrer noopener\">LinkedIn<\/a> <a href=\"https:\/\/www.facebook.com\/inspenetnetwork\" target=\"_blank\" rel=\"noreferrer noopener\">Facebook<\/a> <a href=\"https:\/\/www.instagram.com\/inspenet\/\" target=\"_blank\" rel=\"noreferrer noopener\">Instagram<\/a> <a href=\"https:\/\/twitter.com\/Inspenetnetwork\" target=\"_blank\" rel=\"noreferrer noopener\">X<\/a><\/p>\n\n<p><strong>Source:<\/strong> <strong>\n  <a href=\"https:\/\/www.cnat.es\/notpdf\/NI%2036%20Fin%20Recarga%20CNT.pdf\" data-type=\"link\" data-id=\"https:\/\/www.cnat.es\/notpdf\/NI%2036%20Fin%20Recarga%20CNT.pdf\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">CNAT<\/a>\n<\/strong><\/p>\n\n<p><strong>Photo: Nuclear Forum<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The recharge program was completed four days ahead of the original schedule.<\/p>\n","protected":false},"author":8404,"featured_media":164026,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"_acf_changed":false,"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":""},"categoria_noticias":[13026,13044],"etiqueta_noticias":[],"class_list":["post-164042","noticias","type-noticias","status-publish","has-post-thumbnail","hentry","categoria_noticias-energy","categoria_noticias-new-energies"],"acf":[],"_links":{"self":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/164042","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias"}],"about":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/types\/noticias"}],"author":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/users\/8404"}],"replies":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/comments?post=164042"}],"version-history":[{"count":0,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/164042\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media\/164026"}],"wp:attachment":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media?parent=164042"}],"wp:term":[{"taxonomy":"categoria_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/categoria_noticias?post=164042"},{"taxonomy":"etiqueta_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/etiqueta_noticias?post=164042"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}