{"id":144819,"date":"2024-04-10T16:31:13","date_gmt":"2024-04-10T21:01:13","guid":{"rendered":"https:\/\/inspenet.com\/noticias\/ntpc-e-increase-in-carbon-production\/"},"modified":"2024-04-10T16:34:37","modified_gmt":"2024-04-10T21:04:37","slug":"ntpc-e-increase-in-carbon-production","status":"publish","type":"noticias","link":"https:\/\/inspenet.com\/en\/news\/ntpc-e-increase-in-carbon-production\/","title":{"rendered":"India&#8217;s NTPC projects increase in coal production by 2025"},"content":{"rendered":"\n<p><strong>NTPC has defined its plans to increase its coal production<\/strong>, among the blocks allocated by the State, by approximately 16% for the 2024 &#8211; 2025 period, with the objective of meeting the country&#8217;s increasing energy demand.<\/p>\n\n<h2 class=\"wp-block-heading\">Increase coal capacity and production<\/h2>\n\n<p>In order to contribute to the supply of its energy needs, <strong>NTPC aims to achieve an output of 40 million tons of coal<\/strong>, compared to 34.38 million tons in previous years. This increase in production is intended to cover 15% of its estimated fuel needs.<\/p>\n\n<p>The initiative to expand the extraction of coal from the so-called captive blocks is part of a broader strategy to <strong>boost domestic <a href=\"https:\/\/inspenet.com\/en\/news\/india-underground-coal-production\/\" target=\"_blank\" data-type=\"post\" data-id=\"110501\" rel=\"noreferrer noopener\">coal production<\/a> and reduce imports<\/strong>. NTPC has indicated that this growth will be supported by the implementation of various approaches and technologies, including <strong>improved mine planning and automation<\/strong>.<\/p>\n\n<p>In the past years 2022 and 2023, NTPC and its partners imported approximately 16.5 million tons of coal, a figure that decreased to 10.5 million tons between 2023 and 2024.  <strong>This increase in individual production capacity helps the country&#8217;s objectives of strengthening local production and satisfying its demands<\/strong>. India&#8217;s thermal coal imports stood at 14.69 million tons in February, up from 10.28 million tons in the previous year.<\/p>\n\n<h2 class=\"wp-block-heading\">NTPC&#8217;s 2025 target<\/h2>\n\n<p>NTPC is responsible for a quarter of India&#8217;s electricity demand, having produced 422 TWh in 2023 and 2024, an increase of 6% over the previous fiscal year. The company <strong>plans to expand its generation capacity by 5GW in the current year<\/strong>, following an addition of 3.9GW in 2023 and 2024, for a total capacity of approximately 76GW.<\/p>\n\n<p>Of the new capacity proposed for 2024 and 2025, 60% will be based on renewable energy, <strong>with the remainder corresponding to thermal energy<\/strong>. NTPC&#8217;s current renewable energy operating capacity is 3.5GW.<\/p>\n\n<p>The goal of <strong>\n  <a href=\"https:\/\/ntpc.co.in\/\" data-type=\"link\" data-id=\"https:\/\/ntpc.co.in\/\" target=\"_blank\" rel=\"noreferrer noopener\">India&#8217;s NTPC<\/a>\n<\/strong> is to raise its non-fossil energy capacity to 45-50% of its generation portfolio by 2032, with a planned renewable energy capacity of 60GW of the projected 130GW in total. The company currently has more than 20GW of renewable energy projects under development.<\/p>\n\n<p><strong>Follow us on social networks and don&#8217;t miss any of our publications!<\/strong><\/p>\n\n<p><a href=\"https:\/\/inspenet.com\/en\/\" target=\"_blank\" rel=\"noreferrer noopener\">Inspenet.com<\/a> <a href=\"https:\/\/www.youtube.com\/@inspenet\" target=\"_blank\" rel=\"noreferrer noopener\">YouTube<\/a> <a href=\"https:\/\/www.linkedin.com\/company\/inspenetnetwork\" target=\"_blank\" rel=\"noreferrer noopener\">LinkedIn<\/a> <a href=\"https:\/\/www.facebook.com\/inspenetnetwork\" target=\"_blank\" rel=\"noreferrer noopener\">Facebook<\/a> <a href=\"https:\/\/www.instagram.com\/inspenet\/\" target=\"_blank\" rel=\"noreferrer noopener\">Instagram<\/a> <a href=\"https:\/\/twitter.com\/Inspenetnetwork\" target=\"_blank\" rel=\"noreferrer noopener\">X<\/a><\/p>\n\n<p><strong>Source and photo: NTPC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>NTPC aims to achieve production of 40 million tons of coal and surpass last year&#8217;s figures.<\/p>\n","protected":false},"author":8404,"featured_media":144804,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"_acf_changed":false,"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":""},"categoria_noticias":[13030,13060],"etiqueta_noticias":[],"class_list":["post-144819","noticias","type-noticias","status-publish","has-post-thumbnail","hentry","categoria_noticias-industry","categoria_noticias-mining"],"acf":[],"_links":{"self":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/144819","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias"}],"about":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/types\/noticias"}],"author":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/users\/8404"}],"replies":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/comments?post=144819"}],"version-history":[{"count":0,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/144819\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media\/144804"}],"wp:attachment":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media?parent=144819"}],"wp:term":[{"taxonomy":"categoria_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/categoria_noticias?post=144819"},{"taxonomy":"etiqueta_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/etiqueta_noticias?post=144819"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}