{"id":142943,"date":"2024-04-04T16:07:31","date_gmt":"2024-04-04T20:37:31","guid":{"rendered":"https:\/\/inspenet.com\/noticias\/crane-install-wind-turbines-great-handle\/"},"modified":"2024-04-04T16:08:31","modified_gmt":"2024-04-04T20:38:31","slug":"crane-install-wind-turbines-great-handle","status":"publish","type":"noticias","link":"https:\/\/inspenet.com\/en\/news\/crane-install-wind-turbines-great-handle\/","title":{"rendered":"New Crane Unveiled for Installing Giant Wind Turbines"},"content":{"rendered":"\n<p>WindSpider has introduced a <strong>crane designed to facilitate the installation of large wind turbines<\/strong>. This innovative machinery, which is self-assembling and has no weight or height restrictions, promises to be an invaluable tool in areas of high wind incidence, representing a significant breakthrough in terms of reducing the costs associated with the life cycle of wind turbines.<\/p>\n\n<h2 class=\"wp-block-heading\">Versatile crane for the installation of wind turbines<\/h2>\n\n<p>The company is in the initial production phase of the first large-scale unit of this aluminum crane system, intended for the installation and replacement of critical wind turbine components <strong>both onshore and offshore<\/strong>. This innovative design takes advantage of the turbine tower as a support point, eliminating relative movement between the crane and the wind turbine.<\/p>\n\n<p>With a <strong>lifting<\/strong> capacity of <strong>more than 1500 tons<\/strong>, <strong>\n  <a href=\"https:\/\/windspider.com\/\" target=\"_blank\" rel=\"noreferrer noopener\">WindSpider<\/a>\n<\/strong> is positioned as a solution to several of the most significant challenges facing the wind industry. It is poised to accommodate future generations of wind turbines at a dramatically reduced cost, transforming offshore floating wind turbine installation and maintenance operations by <strong>enabling on-site repairs rather than requiring towing to sh<\/strong>ore.<\/p>\n\n<p>The development of this technology is supported by a team with deep industry experience and is carried out in close collaboration with some of the world&#8217;s leading wind operators. Recently, the company has secured additional financing from its current owners, such as the IKM Group, and has attracted interest from new investors.<\/p>\n\n<h2 class=\"wp-block-heading\">Strategic alliances<\/h2>\n\n<p>In a recent development, WindSpider has entered into a partnership with Leirvik Group AS, marking the start of construction of the first WindSpider unit. Leirvik will not only invest in WindSpider, but will also become a key industrial partner. Both companies have completed a study validating the <strong>use of aluminum in the WindSpider structure <\/strong>and will continue to collaborate on design and engineering.<\/p>\n\n<p>The choice of aluminum brings consequent advantages, including a notable reduction in weight and an improvement in manufacturing and maintenance processes, with the possibility of using aluminum profiles designed specifically for this purpose.<\/p>\n\n<p>Hans Olav Hide, chairman of the board of WindSpider, has expressed his satisfaction with the partnership with Leirvik, highlighting the synergies and the combination of WindSpider&#8217;s innovation with Leirvik&#8217;s industrial expertise as key factors for the success of the project. This cooperation will give WindSpider access to Leirvik&#8217;s valuable resources, facilitating the preparation, manufacture and testing of the first WindSpider unit.<\/p>\n\n<p>For his part, Helge Gj\u00f8s\u00e6ter, CEO of Leirvik, has recognized the disruptive potential of the WindSpider system in the global wind market and anticipates that Leirvik&#8217;s expertise in large-scale aluminum constructions will perfectly complement WindSpider&#8217;s vision, promising substantial benefits from building the system in aluminum.<\/p>\n\n<p>Such innovations not only represent a technological breakthrough, but also drive sustainability in the <strong>energy sector<\/strong>. By reducing costs and facilitating the installation of <strong>wind turbines <\/strong>in previously inaccessible locations, WindSpider contributes directly to accelerating the shift to <strong>renewable energy sources<\/strong> and reducing dependence on fossil fuels.<\/p>\n\n<p><strong>Don&#8217;t miss any of our posts and follow us on social media!<\/strong><\/p>\n\n<p><a href=\"https:\/\/inspenet.com\/en\/\" target=\"_blank\" rel=\"noreferrer noopener\">Inspenet.com<\/a> <a href=\"https:\/\/www.youtube.com\/@inspenet\" target=\"_blank\" rel=\"noreferrer noopener\">YouTube<\/a> <a href=\"https:\/\/www.linkedin.com\/company\/inspenetnetwork\" target=\"_blank\" rel=\"noreferrer noopener\">LinkedIn<\/a> <a href=\"https:\/\/www.facebook.com\/inspenetnetwork\" target=\"_blank\" rel=\"noreferrer noopener\">Facebook<\/a> <a href=\"https:\/\/www.instagram.com\/inspenet\/\" target=\"_blank\" rel=\"noreferrer noopener\">Instagram<\/a> <a href=\"https:\/\/twitter.com\/Inspenetnetwork\" target=\"_blank\" rel=\"noreferrer noopener\">X<\/a><\/p>\n\n<p><strong>Source and photo: windspider.com<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The crane is designed for the installation and replacement of wind turbine components both onshore and offshore.<\/p>\n","protected":false},"author":8403,"featured_media":142925,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"_acf_changed":false,"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":""},"categoria_noticias":[13026,13044],"etiqueta_noticias":[],"class_list":["post-142943","noticias","type-noticias","status-publish","has-post-thumbnail","hentry","categoria_noticias-energy","categoria_noticias-new-energies"],"acf":[],"_links":{"self":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/142943","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias"}],"about":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/types\/noticias"}],"author":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/users\/8403"}],"replies":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/comments?post=142943"}],"version-history":[{"count":0,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/142943\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media\/142925"}],"wp:attachment":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media?parent=142943"}],"wp:term":[{"taxonomy":"categoria_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/categoria_noticias?post=142943"},{"taxonomy":"etiqueta_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/etiqueta_noticias?post=142943"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}