{"id":140152,"date":"2024-03-24T10:00:00","date_gmt":"2024-03-24T14:30:00","guid":{"rendered":"https:\/\/inspenet.com\/?p=140152"},"modified":"2024-03-23T21:30:42","modified_gmt":"2024-03-24T02:00:42","slug":"360energy-inaugurated-solar-power-station-la-rioja-ii","status":"publish","type":"noticias","link":"https:\/\/inspenet.com\/en\/news\/360energy-inaugurated-solar-power-station-la-rioja-ii\/","title":{"rendered":"360Energy Boosts Capacity with New Solar Plant in Argentina"},"content":{"rendered":"\n<p><strong>360Energy inaugurates solar power plant as the official opening of the PSF La Rioja II Solar Park<\/strong> in Argentina. This new development, which began commercial operation on March 14, represents the third solar photovoltaic energy project that the company has launched under CAMMESA&#8217;s supervision this year, following the La Rioja III and Ca\u00f1ada Honda IV projects.<\/p>\n\n<h2 class=\"wp-block-heading\">360Energy inaugurates solar power plant called &#8220;La Rioja II&#8221;.<\/h2>\n\n<p>With the capacity to generate approximately <strong>55 GWh per year<\/strong>, the wind farm stands out for its 22 MW installation. The infrastructure of the La Rioja II FSP includes 92 inverters, 682 Arctech solar trackers and 38,412 <a href=\"https:\/\/inspenet.com\/en\/news\/solar-panel-manufacturer-recycled-solar-panels\/\" data-type=\"post\" data-id=\"130702\" target=\"_blank\" rel=\"noreferrer noopener\">\n  <strong>photovoltaic panels<\/strong>\n<\/a> panels manufactured by Astroenergy and Trina Solar, demonstrating the integration of state-of-the-art technology in its construction.<\/p>\n\n<p>In addition, this project is part of the 360Energy La Rioja Solar Complex, which occupies nearly 300 hectares of previously unused land. Once all phases are completed, the complex will have a total capacity of 128 MWp, distributed among the 36 MW of La Rioja III, the 22 MW of the recently inaugurated &#8220;La Rioja II&#8221; and the future 70 MW to be provided by La Rioja I and IV.<\/p>\n\n<p>Maximiliano Ivanissevich, the Director of Corporate Affairs of <a href=\"https:\/\/www.360energy.com.ar\/\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/www.360energy.com.ar\/\" rel=\"noreferrer noopener\">\n  <strong>360Energy<\/strong>\n<\/a>expressed his enthusiasm for the recent inauguration, highlighting this achievement as a sign of the company&#8217;s strong commitment to innovation, sustainability and its key role in the transition to cleaner energy sources in Argentina.<\/p>\n\n<p><strong>Don&#8217;t miss any of our posts and follow us on social media!<\/strong><\/p>\n\n<p><a href=\"https:\/\/inspenet.com\/en\/\" target=\"_blank\" rel=\"noreferrer noopener\">Inspenet.com<\/a> <a href=\"https:\/\/www.youtube.com\/@inspenet\" target=\"_blank\" rel=\"noreferrer noopener\">YouTube<\/a> <a href=\"https:\/\/www.linkedin.com\/company\/inspenetnetwork\" target=\"_blank\" rel=\"noreferrer noopener\">LinkedIn<\/a> <a href=\"https:\/\/www.facebook.com\/inspenetnetwork\" target=\"_blank\" rel=\"noreferrer noopener\">Facebook<\/a> <a href=\"https:\/\/www.instagram.com\/inspenet\/\" target=\"_blank\" rel=\"noreferrer noopener\">Instagram<\/a><\/p>\n\n<p><strong>Source and photo: 360Energy<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Joshua Falcon, March 24, 2024.<br \/>\n360Energy has completed the official opening of the PSF La Rioja II Solar Park, located in Argentina. This new development, which began commercial operation on March 14, represents the company&#8217;s third solar photovoltaic power project.<\/p>\n","protected":false},"author":8404,"featured_media":139758,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"_acf_changed":false,"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":""},"categoria_noticias":[13026,13044],"etiqueta_noticias":[],"class_list":["post-140152","noticias","type-noticias","status-publish","has-post-thumbnail","hentry","categoria_noticias-energy","categoria_noticias-new-energies"],"acf":[],"_links":{"self":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/140152","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias"}],"about":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/types\/noticias"}],"author":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/users\/8404"}],"replies":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/comments?post=140152"}],"version-history":[{"count":0,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/140152\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media\/139758"}],"wp:attachment":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media?parent=140152"}],"wp:term":[{"taxonomy":"categoria_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/categoria_noticias?post=140152"},{"taxonomy":"etiqueta_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/etiqueta_noticias?post=140152"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}