{"id":124086,"date":"2024-01-28T13:00:00","date_gmt":"2024-01-28T17:30:00","guid":{"rendered":"https:\/\/inspenet.com\/?p=124086"},"modified":"2024-02-19T21:28:04","modified_gmt":"2024-02-20T01:58:04","slug":"endesa-ia-digital-twins-hydroelectric","status":"publish","type":"noticias","link":"https:\/\/inspenet.com\/en\/news\/endesa-ia-digital-twins-hydroelectric\/","title":{"rendered":"Endesa uses AI to create \u201cdigital twins\u201d of its hydroelectric plants"},"content":{"rendered":"\n<p>Artificial Intelligence (AI) is incorporated into the aquatic field with the initiative of <strong><a href=\"https:\/\/www.endesa.com\/es\" target=\"_blank\" rel=\"noopener\">Endesa<\/a><\/strong> , which has developed <strong>&#8220;digital twins&#8221; of its hydroelectric plants<\/strong> . This innovation makes it possible to carry out 3D virtual visits and carry out preventive evaluations to analyze the performance of these facilities.<\/p>\n\n<p>\u201c <em>Endesa has 153 hydroelectric plants spread throughout Spain, their management is essential, but their location sometimes generates difficulties, so creating these digital twins has been crucial to improve their knowledge and operation<\/em> ,\u201d comments Santiago Dom\u00ednguez, head of of Hydroelectric Generation of the company.<\/p>\n\n<h2 class=\"wp-block-heading\">Digital twins in hydroelectric plants: the Endesa project<\/h2>\n\n<p>The pilot project of the &#8220;digital twin&#8221; to carry out virtual tours was launched in 2023 at the El Pintado hydroelectric plant, located in Seville. Endesa&#8217;s Hydro Iberia Predictive Maintenance team led the development, creating a model similar to Street View but intended for the interior of the plant.<\/p>\n\n<p>To carry out this initiative, <strong>360\u00ba cameras and lidar cameras<\/strong> equipped with the latest technology were installed, allowing the necessary depth to be obtained to generate three-dimensional spaces with high-resolution images.<\/p>\n\n<p>This application makes it possible <strong>to make virtual visits to the facility<\/strong> to observe all the equipment and infrastructure of the plant. The scope of this model is very diverse and includes virtual visits with suppliers or internal personnel, visualization of equipment and instrumentation, taking measurements in the installation, visualization of plant plans and even the three-dimensional model of the complete plant.<\/p>\n\n<p>In addition, this system allows you to associate relevant documentation (plans, photographs, diagrams, manuals, databases, sensor configuration files for predictive maintenance, among others) to the image of the equipment and systems that make up the hydraulic power plant (turbine, group oil, remote control, etc.), facilitating direct access in case of need for consultation by staff.<\/p>\n\n<h2 class=\"wp-block-heading\">Model expansion<\/h2>\n\n<p>After the successful implementation of the pilot at the El Pintado plant, the company has expanded this model to nine other plants. These include the plants of Tajo de la Encantada (Andalusia) and Guillena (Andalusia), Eume (Galicia), Moncabril (Galicia) and Pe\u00f1adrada (Castilla y Le\u00f3n), as well as Canelles (Catalonia), Sallente (Catalonia), Moralets (Catalonia ) and Ser\u00f3s (Catalonia).<\/p>\n\n<p>\u201c<em>But we have not only developed the digital twin to have that 360 view of the facilities, but we have launched a diagnostic twin that receives more than 6,000 analog measurements in real time, such as temperature, pressure, speed, vibration, etc. and on which it estimates future values. These models are adjusted taking the normal behavior of the equipment and warn when the values \u200b\u200breceived in real time do not adjust to the estimated values.<\/em>\u201dexplains Dom\u00ednguez.<\/p>\n\n<p>Currently, Endesa has implemented digital twin models for diagnosis in the 38 main <strong><a href=\"https:\/\/inspenet.com\/en\/news\/challenges-for-hydropower-according-to-iha\/\" data-type=\"post\" data-id=\"87030\">hydroelectric plants<\/a><\/strong> , covering approximately 70% of the total installed capacity. Monitoring of essential and critical equipment is carried out to allow remote viewing by Operation and Maintenance specialists. The information collected is presented on various screens, where analog data is represented, facilitating more immediate, accessible and dynamic control of the operation of the installation.<\/p>\n\n<p><strong>Don&#8217;t miss any of our posts and follow us on social media!<\/strong><\/p>\n\n<p><a href=\"https:\/\/inspenet.com\/en\/\" target=\"_blank\" rel=\"noreferrer noopener\">Inspenet.com<\/a> <a href=\"https:\/\/www.youtube.com\/@inspenet\" target=\"_blank\" rel=\"noreferrer noopener\">YouTube<\/a> <a href=\"https:\/\/www.linkedin.com\/company\/inspenetnetwork\" target=\"_blank\" rel=\"noreferrer noopener\">LinkedIn<\/a> <a href=\"https:\/\/www.facebook.com\/inspenetnetwork\" target=\"_blank\" rel=\"noreferrer noopener\">Facebook<\/a> <a href=\"https:\/\/www.instagram.com\/inspenet\/\" target=\"_blank\" rel=\"noreferrer noopener\">Instagram<\/a><\/p>\n\n<p><strong>Source: elperiodicodelaenergia.com<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Inspenet, January 28, 2024.<br \/>\nArtificial Intelligence (AI) is incorporated into the aquatic field with the initiative of Endesa, which has developed &#8220;digital twins&#8221; of its hydroelectric plants. This innovation makes it possible to carry out 3D virtual visits and carry out preventive evaluations to analyze the performance of these facilities.<\/p>\n","protected":false},"author":8403,"featured_media":124059,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"_acf_changed":false,"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":""},"categoria_noticias":[13034,13078],"etiqueta_noticias":[],"class_list":["post-124086","noticias","type-noticias","status-publish","has-post-thumbnail","hentry","categoria_noticias-curiosities","categoria_noticias-innovation"],"acf":[],"_links":{"self":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/124086","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias"}],"about":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/types\/noticias"}],"author":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/users\/8403"}],"replies":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/comments?post=124086"}],"version-history":[{"count":0,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/124086\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media\/124059"}],"wp:attachment":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media?parent=124086"}],"wp:term":[{"taxonomy":"categoria_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/categoria_noticias?post=124086"},{"taxonomy":"etiqueta_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/etiqueta_noticias?post=124086"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}