{"id":100171,"date":"2023-09-21T11:55:29","date_gmt":"2023-09-21T15:55:29","guid":{"rendered":"https:\/\/inspenet.com\/noticias\/wind-farm-vineyard-wind-1-laying-cables\/"},"modified":"2025-08-12T10:57:13","modified_gmt":"2025-08-12T14:57:13","slug":"wind-farm-vineyard-wind-1-laying-cables","status":"publish","type":"noticias","link":"https:\/\/inspenet.com\/en\/news\/wind-farm-vineyard-wind-1-laying-cables\/","title":{"rendered":"Vineyard Wind 1 offshore wind farm: cable laying began"},"content":{"rendered":"\n<p>Inspenet, September 21, 2023.<\/p>\n\n\n\n<p>Operations to install interconnection cables are about to begin at the Vineyard Wind 1 offshore wind farm, which is located in the United States and has a capacity of 800 MW.<\/p>\n\n\n\n<p>The work will be carried out by Jan De Nul&#8217;s Isaac Newton vessel, starting with cable lines five and six. This will remain in the area until early October, according to the report provided by Vineyard Wind, which is a joint venture between Avangrid and Copenhagen Infrastructure Partners (CIP).<\/p>\n\n\n\n<p>To provide support for cable laying activities on different lines, the support ship C-PIONEER will be present. In addition, the support ship ADHEMAR DE SAINT-VENANT will be in charge of carrying out the trenching and burying of the cables.<\/p>\n\n\n\n<p>Likewise, the F\/V SEAFARER vessel will play a crucial role as a security vessel, monitoring traffic and facilitating the safe navigation of fishing vessels, pleasure craft and others moving around the work areas and project vessels.<\/p>\n\n\n\n<p>In collaboration, Jan De Nul and JDR, which is owned by the TFKable Group, will supply approximately 210 km of 66 kV cables. These will serve to connect the project&#8217;s 62 GE Haliade-X turbines and transport electricity to a substation located offshore, from where it will be transmitted to the electrical grid.<\/p>\n\n\n\n<p>It should be noted that the electricity generated at the offshore substation will subsequently be transferred to land via an export cable supplied by Prysmian.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">About Vineyard Wind 1 Offshore Wind Farm<\/h2>\n\n\n\n<p>The Vineyard Wind 1 offshore wind farm, with a capacity of 800 MW, is located approximately 24 kilometers (15 miles) off the coast of Martha&#8217;s Vineyard and is the first commercial-scale offshore wind farm to be authorized for construction in USA.<\/p>\n\n\n\n<p>Once fully operational by mid-2024, it is anticipated to <strong>produce electricity to power more than 400,000 homes<\/strong> and businesses in the state of Massachusetts.<\/p>\n\n\n\n<p>Additionally, it is expected to create 3,600 full-time jobs, save consumers $1.4 billion over the first 20 years of operation, and reduce <strong><a href=\"https:\/\/inspenet.com\/en\/news\/brazil-emissions-of-carbon-dioxide\/\" data-type=\"post\" data-id=\"95811\">carbon emissions<\/a><\/strong> by more than 1.6 million metric tons annually. This is equivalent to removing approximately 325,000 cars from the roads each year, according to information previously provided by Avangrid and CIP.<\/p>\n\n\n\n<p>Source and photo: https:\/\/www.worldenergytrade.com\/energias-alternativas\/energia-eolica\/comienza-el-tendido-de-cables-en-el-primer-parque-eolico-marino-americana-a-gran- scale<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Inspenet, September 21, 2023.<br \/>\nOperations to install interconnection cables are about to begin at the Vineyard Wind 1 offshore wind farm, which is located in the United States and has a capacity of 800 MW. The work will be carried out by Jan De Nul&#8217;s Isaac Newton vessel, starting with cable lines five and six.<\/p>\n","protected":false},"author":8403,"featured_media":100167,"menu_order":0,"comment_status":"open","ping_status":"closed","template":"","meta":{"_acf_changed":false,"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":""},"categoria_noticias":[13026,13046],"etiqueta_noticias":[],"class_list":["post-100171","noticias","type-noticias","status-publish","has-post-thumbnail","hentry","categoria_noticias-energy","categoria_noticias-wind-energy"],"acf":[],"_links":{"self":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/100171","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias"}],"about":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/types\/noticias"}],"author":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/users\/8403"}],"replies":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/comments?post=100171"}],"version-history":[{"count":0,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/100171\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media\/100167"}],"wp:attachment":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media?parent=100171"}],"wp:term":[{"taxonomy":"categoria_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/categoria_noticias?post=100171"},{"taxonomy":"etiqueta_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/etiqueta_noticias?post=100171"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}