Well-Safe Solutions a plugging and abandonment (P&A) campaign on three subsea wells in UK waters has been completed. The operations were carried out with the plataforma semisumergible Well-Safe Defender in two areas of the North Sea, one is west of the Shetland Islands and the second in the northern sector of this basin.
The unit, built in 1982 and originally known as WilPhoenix, completed its work after passing its Special Periodic Inspection (SPS). This procedure is carried out every five years and allows for an assessment of the platform’s technical condition before it resumes operations.
Well-Safe Defender completes 3 well abandonment operations
During the campaign, the platform intervened in three underwater wells, the first was located west of the Shetland Islands, while the other two were in the Magnus field, in the northern North Sea.
A Magnus, Well-Safe Solutions the work was carried out for EnQuest as part of a multi-year contract, these operations expanded the scope of the campaign and strengthened the company’s involvement in offshore facility decommissioning activities.
After completing its five-year inspection, the platform was also mobilized to support the company’s first contract as an integrated well operator. The agreement included plugging and abandonment operations for a subsea well for a client.
An integrated model for offshore decommissioning
Well-Safe Solutions highlighted the importance of the execution model applied during the campaign, their proposal integrated project management, subsurface studies and design bases (SSBoD), engineering, and the operational capacity of the platform.
This combination allowed for the coordination of the different stages of the work under a single execution structure. According to the company, the model generated opportunities to reduce costs, timelines, and operational risks, while maintaining safety and efficiency as priorities.
The trajectory of the Well-Safe Defender also part of its operational capacity, the semi-submersible platform underwent significant modernization and refurbishment work in 2011 and 2016. Subsequently, Well-Safe Solutions acquired it from Awilco Drilling in June 2022.
With the completion of these three wells, Well-Safe Solutions adds another campaign to its decommissioning activities on the UK continental shelf. The work also highlights the importance of semi-submersible units and integrated services for carrying out offshore well abandonment operations.
Source: Offshore Energy
Photo: Well-Safe Solutions