The multinational oilfield services company SLB, formerly known as Schlumberger, has inaugurated a new fluid systems plant in Pemba, Mozambique. The facility has an initial storage capacity of 21,000 barrels and is designed to meet the needs of offshore oil and gas operations.
With this opening, the company aims to strengthen local capacity for preparing, storing, and distributing fluids used in drilling and well completion activities. The new facilities will thus improve the availability of these materials and facilitate their supply to various offshore operators.
SLB’s Drilling Fluids Plant to Have 21,000-Barrel Capacity
The new infrastructure, also known as a liquid mud plant, has an initial capacity of 21,000 barrels and is prepared to adapt to growing demand.
Drilling fluids perform essential functions during the construction of oil and gas wells. These include transporting rock cuttings to the surface, controlling pressures, and maintaining well stability. Completion fluids, on the other hand, are used during operations that prepare wells for production.
In this context, having specialized facilities near activity zones facilitates logistical planning and material availability. The Pemba plant will enable SLB to serve multiple clients and respond with greater flexibility to the needs of maritime projects.
New Infrastructure to Strengthen Offshore Operations
Furthermore, the opening comes as Mozambique continues to develop its offshore natural gas resources, particularly in the Rovuma Basin, one of the country’s main areas of energy interest.
The availability of specialized fluids is crucial for maintaining the continuity of drilling operations. Therefore, the new plant will reinforce the supply chain and enhance logistical preparedness for increased offshore activity.
Additionally, the infrastructure will contribute to expanding SLB’s responsiveness to its clients’ technical requirements by providing local facilities for fluid storage and handling.
The inauguration coincides with SLB’s 70 years of presence in Mozambique, a period during which the company has participated in developing services and capabilities for the country’s energy industry.
Miguel Baptista, SLB’s General Manager for Central, East, and Southern Africa, highlighted that the investment reflects the company’s confidence in Mozambique’s energy future and its commitment to strengthening local capabilities.
Project Generated Over 100 Jobs in Pemba
In addition to expanding energy infrastructure, the plant’s construction involved significant participation from Mozambican workers.
During the project’s execution, over 100 jobs were created, 80% of which were filled by national citizens. According to SLB, this participation is part of its strategy to develop technical skills and strengthen the presence of local talent in the industry.
The company also expects to maintain this focus during the operational phase, aiming to develop capabilities that meet client needs.
In terms of safety, construction work accumulated over 67,000 labor hours without any recordable safety incidents. This result reflects the prevention and control measures applied during the development of the facilities.
With the new fluid systems plant in Pemba, SLB expands its service capacity in Mozambique and gains infrastructure that can adapt to the growth of offshore drilling activities, while strengthening local logistics and technical capabilities.
Source: American Journal of Transportation
Photo: Shutterstock