Leaks in SPM systems: Marine hoses and PLEM connections

Leaks in SPM systems require an evaluation of marine hoses, PLEM connections, and transfer conditions.
Leaks in SPM systems: Marine hoses and PLEM connections

A leak during crude oil transfer can stop loading, compromise the marine environment, and force interventions on hard-to-access connections. In an SPM system, identifying where the product appears is just the beginning: what movement, pressure, or mounting condition produced the loss of containment also matters.

Marine hoses and PLEM connections form a transfer route that works as an assembly. Understanding their interfaces helps recognize failures, prevent recurrences, and verify terminal readiness prior to the first cargo.

Where containment is lost in an SPM system

An SPM system allows a vessel to berth at an offshore point and transfer product through flexible connections. In a CALM configuration, it integrates an anchored buoy, a subsea manifold, transfer lines, and elements that accommodate movements during operations.

The expression single point mooring / SPM mooring gathers related terms, although SPM also encompasses configurations other than CALM. In this article, the focus is on the CALM buoy and its connection to the pipe end manifold (PLEM), located on the seabed, where the pipeline coming from onshore terminates.

Submarine hoses connect that manifold to the buoy; floating ones link the surface system to the vessel. This separation allows better localization of a leak: flexible body, end fitting, flanged connection, valve, or transfer component. A surface sheen can drift due to currents and appear far from the point where the discharge began.

Commissioning and operational delay risks

Before operating, a minor discrepancy can halt the project: certificates that do not correspond to the installed component, gaskets different from those specified, or incomplete assembly records. When these differences reach commissioning, marine hoses may already be connected, and subsea access turns a simple correction into a costly intervention.

The technical challenge consists in proving that what is installed matches what was designed. For offshore marine hoses, that comparison includes identification, service conditions, end fittings, orientation, and position within the string. An individually approved component may turn out to be unsuitable for the position where it ultimately works.

OCIMF’s SMOG provides recommendations for the operation and maintenance of these terminals (OCIMF, 2015). This technical reference allows for proper contextualization of operational readiness. Subsequent history requires a documented initial condition of the pipe end manifold (PLEM), its connections, and components whose replacement requires offshore mobilization.

Leaks in the flexible body and its ends

Marine hoses can lose containment due to lining deterioration, mechanical damage, or issues at the transition to their end fittings. The outer cover provides clues, but an apparently well-preserved surface does not prove internal condition. Diagnosis requires linking damage location, service history, and specific component construction.

In submarine hoses, unintended contact with the seabed or nearby elements can generate localized abrasion. Repeated bending near a rigid end fitting also deserves attention. If damage recurs in the same position, replacing only the affected section may leave intact the condition that caused the failure.

Some double carcass designs incorporate secondary containment and primary failure detection. Continental’s double carcass and leak detection description illustrates that architecture (Continental, n. d.). That protection belongs to the specific design; it does not automatically cover an external flange leak nor authorize continued operation after an alarm without evaluation by the manufacturer and the operator.

PLEM connections requiring attention

A leak at the connection between the marine hoses and the manifold can be related to the gasket, sealing surfaces, bolt loads, or stresses transmitted by the installed configuration. Finding moisture or product around the flange does not immediately allow attributing the cause to insufficient tightening.

At the pipe end manifold (PLEM), alignment matters because the flexible section transmits loads to the end fitting. Forcing a connection to close a gap can introduce additional stresses. The condition of the faces, gasket compatibility, and assembly traceability help interpret whether the problem originated during installation.

ASME PCC-1 for bolted flange joint assembly provides assembly criteria within its specific scope (ASME, 2022). Its application requires checking geometry and gasket type. It does not replace specific instructions from the marine hose supplier nor does it constitute on its own an authorized procedure for subsea intervention or retightening under pressure.

Installation and testing prior to commissioning

During installation, the behavior of submarine hoses depends on the configuration actually achieved: lengths, buoyancy, orientation, and seabed conditions. Photographs, positioning records, and subsea observations allow comparing that geometry with the planned one. A leak-tight connection at rest may receive different loads when the buoy begins to move.

For offshore marine hoses, OCIMF’s GMPHOM serves as a manufacturing and purchasing reference (OCIMF, 2009). The identified published edition is the fifth, supplemented by a 2019 update on dynamic torsion. It is important to distinguish prototype qualification, factory testing, and testing of the installed assembly.

The pressure, duration, and acceptance criteria of a test must come from applicable documentation and an approved procedure for that system. Copying values from another terminal may subject the CALM buoy or its components to improper conditions. A pressure drop requires analyzing temperature, stabilization, and instrumentation before concluding that a leak exists.

Buoy movement and loads on connections

The CALM buoy responds to waves, current, and vessel actions. Submarine hoses accommodate that movement with variable bending and tension. If the available geometry does not allow the expected response, loads can concentrate near connections or cause contact between elements that should remain separated during operation.

Dynamic analysis allows exploring environmental conditions and movements within defined scenarios. OrcaFlex applications include mooring systems, buoys, and hose strings (Orcina, n. d.). For the operator, its value depends on representing the installed configuration, validating input data, and contrasting results against the manufacturer’s specific limits.

Transient pressure also matters. In Marine Breakaway Couplings, OCIMF describes risks of overpressure and vessel separation that can damage marine hoses and other components (OCIMF, 2008). An emergency disconnection and a pumping shutdown serve different functions; their coordination requires hydraulic and mechanical evaluation of the system, considering valve behavior.

PLEM integration before the first cargo

When different suppliers deliver components, interfaces need a clearly defined responsible party. The compatibility of the pipe end manifold (PLEM) with marine hoses includes dimensions, sealing, allowable loads, and operational requirements. An individual certificate demonstrates aspects of the component, but does not automatically resolve the compatibility of the whole assembly.

This is where SeaWing’s SPM integration scope becomes relevant: the company claims comprehensive design and delivery of the PLEM, subsea pipelines, floating and submarine hoses, as well as commissioning and support during the first cargo (SeaWing, n. d.). That capability responds to the need to coordinate interfaces and evidence across disciplines.

For a project with recurring leaks, the technical discussion should focus on the installed configuration and the probable failure mechanism. SeaWing’s profile on Inspenet Corporate provides insight into its scope and enables contact. The evaluation must clarify engineering, supply, and verification responsibilities, as well as the limits of any proposed intervention.

Commissioning and final terminal verification

Commissioning verifies integrated operation through planned activities and acceptance records. Marine hoses require consistent identification across certificates, drawings, and installed position. For submarine hoses, installation evidence complements test results, especially when an area will lie beyond the reach of routine direct observation.

A CALM buoy ready to operate requires consistency across transfer, communications, and anomaly response. The startup sequence and shutdown criteria must correspond to the terminal procedure. The first cargo needs monitoring and previously accepted conditions, with a continuity decision based on data and identified responsible parties.

To delve deeper into the component, the article on marine hose technologies expands on selection and monitoring. The piece on SPM terminal integrity management provides context on general maintenance. In the event of a confirmed leak, restarting requires resolving its cause and verifying the resulting condition in accordance with system criteria.

Evidence to differentiate the origin of a leak

In offshore marine hoses, an isolated signal rarely explains the entire event. Its temporal relationship with movements, maneuvers, or pressure changes can guide the investigation. The following comparison presents working hypotheses; none replaces confirmation of the loss point or the corresponding engineering evaluation. The comparison requires synchronized and verifiable records.

FindingHypothesis to testUseful evidence
Product next to a flangeSealing issue or external loadAssembly, gasket, and alignment
Localized body damageExcessive abrasion or bendingInspection and installed geometry
Secondary carcass alarmPrimary containment failureSpecific manufacturer diagnosis
Event during valve closureHydraulic transientPressure trends and sequence

Conclusions

Leaks in SPM systems require linking the loss point to the conditions acting on marine hoses and their connections. Assembly, installed geometry, and hydraulic response explain problems that an isolated test might overlook. On a CALM buoy, preventing recurrences requires traceability and cross-disciplinary coordination. The value of an integration such as that claimed by SeaWing lies in connecting those responsibilities with verifiable evidence before operating and after any intervention.

References

  1. American Society of Mechanical Engineers. (2022). Pressure boundary bolted flange joint assembly (ASME PCC-1–2022).
  2. The Yokohama Rubber Co., Ltd. (n. d.). Hose selection. Retrieved October 2, 2026.
  3. Continental. (n. d.). SAFGARD double carcass submarine hose.
  4. Oil Companies International Marine Forum. (2008). Marine breakaway couplings (1st ed.).
  5. Oil Companies International Marine Forum. (2009). Guide to manufacturing and purchasing hoses for offshore moorings (GMPHOM) (5th ed.).
  6. Oil Companies International Marine Forum. (2015). Single point mooring maintenance and operations guide (SMOG) (3rd ed.).
  7. Oil Companies International Marine Forum. (2019). Dynamic torsion load tests for offshore hoses: An update to GMPHOM 2009, section 3.4.10.3 (1st ed.).
  8. Orcina. (n. d.). OrcaFlex applications.
  9. SeaWing. (n. d.). SeaWing. Retrieved September 29, 2026.

Frequently asked questions (FAQs)

Why can a PLEM connection leak?

Due to sealing, assembly, alignment issues, or external loads. Location and records help distinguish the mechanism; observing product next to the joint does not automatically identify its cause. At the pipe end manifold (PLEM), limited access makes prior documentation especially valuable.

Does the hydrostatic test guarantee tightness?

It demonstrates behavior under the tested conditions. Operation introduces movements and transients that require additional verifications according to terminal design and procedures. In marine hoses, results must be related to their position and function within the system.

Does a double carcass allow continued operation?

Secondary containment provides a specific barrier. A primary failure signal requires the response provided for by the manufacturer and operator, even if no visible spill exists yet. On a CALM buoy, that response requires coordination with pumping, valves, and responsible terminal personnel.

What information helps prevent repeated failures?

Component identification, service history, damage location, installed configuration, test results, and pressure records. That evidence allows investigating the cause before selecting a replacement. For submarine hoses, visual records should indicate position, orientation, and observed contact areas.

Verified Author

Mechanical Engineer with specialization in industrial maintenance. 43 years of experience in the oil, petrochemical, gas, metalworking and food industries. Content developer, expert analyst in equipment and corrosion inspection and plant shutdown technical management. Qualified and certified in non-destructive testing techniques UT, PT, VT, MT, RT.